Collection rainwater area outside the boundary - SS Rainwater Management

NC-v4.1 SSc4:Rainwater Management
posted by  Juliana Candido  on 

We are working on a project whose LEED Boundary covers the whole exterior area of the site, but there is an existing building that will not be altered.

0

Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?

NC-v4.1 LTc5:Access to Quality Transit
posted by  Zabdi Valdez  on 

I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips.

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Jan 31, 2024, 9:25 am

Pre-cast concrete structure environmental product declarations

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Maiz Rech  on 

Considering the building is built of a precast concrete structure that was made of steel and cement and those present environmental procuct declarations, may I use these EPDs to comply wi

0

Plug loads for server rooms

NC-2009 EAp2:Minimum Energy Performance
posted by  MARCIO OROFINO  on 

Hi. I am working for this project - a small one-floor office building, which has a 14 m2 server room.

5
Tue Mar 14, 2023, 8:39 am

Hotel Resort - multiple blocks as a "single building"

Hospitality-NC-v4 MPR3:Must comply with project size requirements
posted by  A&L SUSTENTABILIDADE   on 

Our project is a Hotel Resort, consisting of the main admin building, apartment blocks, individual villas, spa blocks, utility blocks, restaurants, multipurpose buildings, etc.  

1
Sat Nov 26, 2022, 10:49 am

Recycling rate of construction and demolition waste

CS-v4 MRc5:Construction and demolition waste management
posted by  Tiago Rigobello  on 

How can we prove the recycling rate of construction and demolition waste made by the recycler? What are the options in Brazil?

 

Thanks! Best regards!

0

WEp2 - add shower to awarded credit

NC-v4 WEp2:Indoor water use reduction
posted by  A&L SUSTENTABILIDADE   on 

During the Design Review, we have submitted the LT pre-requisite/credit Indoor Water Use Reduction and we have earned a total of 6 points.