Collection rainwater area outside the boundary - SS Rainwater Management
NC-v4.1 SSc4:Rainwater Managementposted by Juliana Candido on
We are working on a project whose LEED Boundary covers the whole exterior area of the site, but there is an existing building that will not be altered.
Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?
NC-v4.1 LTc5:Access to Quality Transitposted by Zabdi Valdez on
I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips.
BPDO Credits: Is there a minimum limit on quantity/percentage of products from the same CSI class that I have to implement?
NC-v4.1 MRc2:Environmental Product Declarationsposted by Marcelo Alencar Pereira on
Hello LEEDers!
Pre-cast concrete structure environmental product declarations
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Maiz Rech on
Considering the building is built of a precast concrete structure that was made of steel and cement and those present environmental procuct declarations, may I use these EPDs to comply wi
Definitions for a lab/office building
NC-v4 LTc7:Reduced parking footprintposted by Maiz Rech on
Hello!
Plug loads for server rooms
NC-2009 EAp2:Minimum Energy Performanceposted by MARCIO OROFINO on
Hi. I am working for this project - a small one-floor office building, which has a 14 m2 server room.
Hotel Resort - multiple blocks as a "single building"
Hospitality-NC-v4 MPR3:Must comply with project size requirementsposted by A&L SUSTENTABILIDADE on
Our project is a Hotel Resort, consisting of the main admin building, apartment blocks, individual villas, spa blocks, utility blocks, restaurants, multipurpose buildings, etc.
Recycling rate of construction and demolition waste
CS-v4 MRc5:Construction and demolition waste managementposted by Tiago Rigobello on
How can we prove the recycling rate of construction and demolition waste made by the recycler? What are the options in Brazil?
Thanks! Best regards!
Tier 1: On-site renewable energy generation - excluded from LEED Boundary
NC-v4.1 EAc5:Renewable Energyposted by A&L SUSTENTABILIDADE on
Hi, everyone!
WEp2 - add shower to awarded credit
NC-v4 WEp2:Indoor water use reductionposted by A&L SUSTENTABILIDADE on
During the Design Review, we have submitted the LT pre-requisite/credit Indoor Water Use Reduction and we have earned a total of 6 points.