Required documentation for submittal
Pilot-Credits SSpc129:Comprehensive Compostingposted by Victoria Rios Esteve on
Hi everyone,
MInisplit Units
NC-v4 EQp1:Minimum indoor air quality performanceposted by Paula Hernandez on
Hi, I would like to know if minisplit (non-ducted) units have to comply with Standard 62.1-2010, Section 5.8, "...p0articulate filters or air cleaners with a minimum efficiency reporting valu
Occupancy before building is finished
NC-2009 PIf4:Schedule and Overview Documentsposted by Victoria Rios Esteve on
Hi everyone! Im pretty sure this question is not rightly set in this category, but here we go...
Economizer for VRF and other systems as per ASHRAE 90.1-2010 requirement
NC-v4 EAc2:Optimize energy performanceposted by Micaela Smulevich on
when working With Roof Tops machines and commercial split system or water chiller with air handling units I consider the economizer is required as per ASHRAE section 6.5.1, is this correct?&nb
Owner´s representative: requirements? can be changed?
posted by Victoria Rios Esteve on
Hi everyone!
Existing building major renovation
NC-v4 LTc2:Sensitive land protectionposted by Victoria Rios Esteve on
Hi everyone!
"Open to update" an already awarded credit
CS-2009 WEp1:Water Use Reductionposted by Victoria Rios Esteve on
Hi everyone!
Installed and not Installed HVAC
CS-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hi,
I am modeling a C&S building for the Construction Submittal, and I have to adjust the Design Submittal Energy Model because the Owner change the brand of the VRF systems.
Project Zero Lot Line with Major Renovation
NC-v4 SSp1:Construction activity pollution preventionposted by Victoria Rios Esteve on
Hi everyone!
Still able to have commingled waste being recycle?
NC-v4 MRp2:Construction and demolition waste management planningposted by Victoria Rios Esteve on
Hi everyone!