Forum quick links
v4.1 O+M: working with a new building
posted by Victoria Rios Esteve on
Hi everyone,
Water sving are 101% according to calculator
NC-v4 WEp1:Outdoor water use reductionposted by Alexia Anastassiadis on
Hi, I am working on a project in Argentina.
Water reduction is over 101% and ET0 values
NC-v4.1 WEp1:Outdoor Water Use Reductionposted by Alexia Anastassiadis on
Hi! I just got back a review on this PR and the reviewer made 2 comments:
v2009: Design Submittal doubts
posted by Victoria Rios Esteve on
Hi everyone! We have a project which is registered to be certified with v2009. We haven't done Preliminary Design Submittal yet and we are aware of v2009 sunset on June 30.
WC flushing valves to be adjusted manually
NC-v4 WEc2:Indoor water use reductionposted by Victoria Rios Esteve on
Hi everyone! On our project, we have installed wc flushing valves that can be manually adjusted to gain higher water use reduction. This is specified in manufacturer's catalogue.
Roll out mats specifications?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Victoria Rios Esteve on
Hi everyone! On our project, we are placing rollout mats on the exterior but under roof hanging. Do you have any suggestion on brand/model/type we can get to achieve this credit?
one or two buildings?
posted by Victoria Rios Esteve on
Hi everyone!
MERV 8 upstream cooling coils
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Paula Hernandez on
Hi,
We are working in an EBOM v4.1 project. I have one question.
Perimeter Control: is it necessary?
NC-v4 SSp1:Construction activity pollution preventionposted by Victoria Rios Esteve on
Hi everyone!
International project - no Green-e certified energy
NC-2009 EAc6:Green powerposted by Victoria Rios Esteve on
Hi everyone!