Forum quick links
Drop off spaces only
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Lewis Hewton on
Hi all Our project has drop off zones only and no new parking on-site.
enhanced refrigeration management credit
NC-v4 EAc6:Enhanced refrigerant managementposted by david gordon on
can someone explain how/why a credit is achieved under the LEEDv4 , enhanced refrigerant management.
Water Budget Tool or v4 Outdoor Water Use Reduction Calculator?
NC-v4 WEp1:Outdoor water use reductionposted by Quentin Jackson on
Hi all, I'm doing a LEED v4 NC project in Australia. The LEED v4 manual says to use the Watersense Water Budget Tool (no reference to the v4 Outdoor Water Use Reduction Calculator). My problem w
Cooling tower cycles
Pilot-Credits WEpc17:Cooling tower water useposted by Phuc Do on
Hi all, Our project is using Munters cooling tower in which the cooling tower cycles measured continuously and the dump cycle adjusted accordingly.
Chain of Custody (COC) - Direct Delivery to Site
CI-2009 MRc7:Certified Woodposted by Christie Rimes on
We are procuring noggings that are FSC certified. The vendor doesn't have chain of custody certification.
Energy Modelling - Australia
NC-v4 EAp2:Minimum energy performanceposted by Quentin Jackson on
We have a Green Building Council in Australia that has a very advanced energy simulation methodology that achieves the same outcomes as the ASHRAE 90.1 process outlined in LEED.
BD+C New Construction - New Stadium
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Quentin Jackson on
Hi all, I'm preparing to register a new project (new stadium) and would like to double check that it is a 'single building'.
100% OA VAV Base Building system
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Christie Rimes on
Hi, the CI project I am working on uses only the base building system supply for meeting rooms with between 2 and 8 people.
ASHRAE 90.1 2007 Appendix G System Type 6
NC-2009 EAp2:Minimum Energy Performanceposted by deborah davidson on
We are working on a project which falls under the category of System 6 - Packaged VAV with PFP Boxes for the Baseline Building.
100% Outside Air systems
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Christie Rimes on
The base building HVAC system uses 100% outside air. Therefore there are no return grilles. I am assuming that the requirement for filtration then is not applicable?