Forum quick links
What type space to place it on the ARC platform for a Casino?
posted by LEED Pro Consultant on
hello everyone,
We are currently working on project O+M for existing buildings v4.1 for a casino in Mexico.
CO2 Sensors for Phonebooths
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by LEED Pro Consultant on
Hello our project is 3 office floors with some spaces destined only for phonebooths wich are only designed for 1 person, however because of the small area the calculations to obtain occu
GCCA EPD Tool
NC-v4.1 MRc2:Environmental Product Declarationsposted by Celeste Ceballos on
When requesting EPDs to our concrete manufacturer, we were given EPDs generated via the Global Cement and Concrete Association's EPD Tool.
Safety First: Re-enter your workplace
posted by Andrea Cabllero on
As covid restrictions are being lifted, what does the future of Safety First-Re-enter your workplace look like?
Alternative transportation program
EBOM-v4.1 LTp1:Transportation Performanceposted by Mariel Ambiental on
Hello everyone,
vegetated walls
Pilot-Credits SSpc55:Bird collision deterrenceposted by Roberto Camarillo on
Helllo.
Bird Collision deterrence / migratory route
Pilot-Credits SSpc55:Bird collision deterrenceposted by Vladimir Mota on
Hello,
Lack of registration due to COVID absence
Pilot-Credits SSpc55:Bird collision deterrenceposted by Andres Pardo on
Hello, in our office building we have been monitoring bird collisions since 2016.
Zero lot line projects
NC-v4 SSc4:Rainwater managementposted by Gustavo De las Heras Izquierdo on
Path 3 states: "manage on site the runoff from the developed site for the 85th percentile ". I guess this requirement was made to exclude the sidewalk from calculations.
Outdoor water use minimum requirements
CS-v4 WEp1:Outdoor water use reductionposted by Gabriela Mena on
Hi,