Forum quick links
IAQ calculator v03
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Izabela Kwiecinska on
The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w
Can a LEED AP ID+C v4 earn IOc2 EBOM 2009 ?
EBOM-2009 IOc2:LEED Accredited Professionalposted by Izabela Kwiecinska on
Hi Everyone, I am working on LEED EBOM project that was registered in 2009 system. The same time I am preparing for my LEED AP exam (have chosen ID+C speciality).
Which ASHRAE & LEED should I base my simulation on?
NC-2009 EAp2:Minimum Energy Performanceposted by Olaf Dybinski on
Hello, I have a problem with choosing a basis for my simulation. I have a building that was designed in 2015 and is about to be build.
Decorative blue light fixtures
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Agnieszka Rylska on
In our office project there are daylight sensors within 15 feet of the windows which are connected to all lighting fixtures in daylit areas except for a few decorative fixtures on the ceiling (prov
delivery entrance in a shopping mall
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Agnieszka Rylska on
We are working on a project of a shopping mall. The building has a few delivery entrances (on the ground level and underground level) next to the delivery docks.
Recycled content in road underlay material
NC-2009 MRc4:Recycled Contentposted by Agnieszka Rylska on
In our project coal slate which is a waste from a coal mine will be used to create the underlay for the roads and the building. Can this be included in recycled content calculations?
CxA contract
CS-2009 EAc3:Enhanced Commissioningposted by Agnieszka Rylska on
Can Commissioning Authority be contracted through the design firm (architects) as part of the LEED certification contract (CxA would be an employee of the LEED consultant company) and not by the ow
dedicated exhaust
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Agnieszka Rylska on
I would like to make sure what does "dedicated/designated exhaust" mean.
ASHRAE requirements for dry-coolers
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
Cooling system in our project (shopping mall) consists of dry-coolers sprayed with water. What are ASHRAE efficiency requirements for dry-coolers?
Exhaust system tests
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Agnieszka Rylska on
I have two questions regarding exhaust system tests: 1. Do the tests have to be conducted only for local exhaust fans (like e.g.