Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

IAQ calculator v03

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Izabela Kwiecinska  on 

The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w

4
Default Avatar
LEED AP, BREEAM Assessor, WELL AP, Fitwel Ambassador |Associate Director
Colliers International Poland
LEEDuser Basic Member
4 thumbs up
Mon May 8, 2017, 7:43 am

Can a LEED AP ID+C v4 earn IOc2 EBOM 2009 ?

EBOM-2009 IOc2:LEED Accredited Professional
posted by  Izabela Kwiecinska  on 

Hi Everyone, I am working on LEED EBOM project that was registered in 2009 system. The same time I am preparing for my LEED AP exam (have chosen ID+C speciality).

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Feb 3, 2017, 3:04 pm

Which ASHRAE & LEED should I base my simulation on?

NC-2009 EAp2:Minimum Energy Performance
posted by  Olaf Dybinski  on 

Hello, I have a problem with choosing a basis for my simulation. I have a building that was designed in 2015 and is about to be build.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jan 12, 2017, 8:04 am

Decorative blue light fixtures

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Agnieszka Rylska  on 

In our office project there are daylight sensors within 15 feet of the windows which are connected to all lighting fixtures in daylit areas except for a few decorative fixtures on the ceiling (prov

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 9, 2016, 3:52 pm

delivery entrance in a shopping mall

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Agnieszka Rylska  on 

We are working on a project of a shopping mall. The building has a few delivery entrances (on the ground level and underground level) next to the delivery docks.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Sep 9, 2016, 9:29 am

Recycled content in road underlay material

NC-2009 MRc4:Recycled Content
posted by  Agnieszka Rylska  on 

In our project coal slate which is a waste from a coal mine will be used to create the underlay for the roads and the building. Can this be included in recycled content calculations?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Aug 1, 2016, 10:29 am

CxA contract

CS-2009 EAc3:Enhanced Commissioning
posted by  Agnieszka Rylska  on 

Can Commissioning Authority be contracted through the design firm (architects) as part of the LEED certification contract (CxA would be an employee of the LEED consultant company) and not by the ow

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Jul 27, 2016, 2:35 am

dedicated exhaust

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Agnieszka Rylska  on 

I would like to make sure what does "dedicated/designated exhaust" mean.

5
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Jul 25, 2016, 8:14 pm

ASHRAE requirements for dry-coolers

CS-2009 EAp2:Minimum Energy Performance
posted by  Agnieszka Rylska  on 

Cooling system in our project (shopping mall) consists of dry-coolers sprayed with water. What are ASHRAE efficiency requirements for dry-coolers?

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jul 4, 2016, 7:38 am

Exhaust system tests

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Agnieszka Rylska  on 

I have two questions regarding exhaust system tests: 1. Do the tests have to be conducted only for local exhaust fans (like e.g.

7
Sr. Sustainability Project Manager
CodeGreen Solutions
LEEDuser Basic Member
25 thumbs up
Tue May 24, 2016, 8:30 pm