Forum quick links
Locker rooms
CI-2009 IEQc1:Outdoor air delivery monitoringposted by Agnieszka Rylska on
Are CO2 sensors required in locker rooms? Loker rooms are non-regularly occupied spaces but they are also densely-occupied spaces.
renovation of multiple non-contiguous parts of an office
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Agnieszka Rylska on
The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.
producer declaration
CS-2009 MRc4:Recycled contentposted by Agnieszka Rylska on
We received a declaration from a material producer stating that the product "contains ca. 80% recycled content" and "we assume that 50% comes from post-consumer".
Certificates for hot district water?
EBOM-2009 EAc4:On-site and off-site renewable energyposted by Izabela Kwiecinska on
Hello Everyone, We are preparing our Client to buy Green-e certified energy. We don't know if he has to buy also GOs or carbon offsets for district hot water that the building is supplied with.
Sinks in doctor's consulting room
CS-2009 WEp1:Water use reductionposted by Agnieszka Rylska on
Hi!
Electronic equipment
CI-2009 MRc2:Construction waste managementposted by Agnieszka Rylska on
Should electronic equipment be included in the waste calculations (should we monitor it's weight) or should it be only mentioned in the Construction waste management plan that it's exluded from the
Parking spaces for trucks
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Alicja Bieszyńska on
My project is a distribution center that serves number of loading trucks every day.
water bills received every 3 months
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Agnieszka Rylska on
Our project receives water bills including water usage every 3 months.
shared waste area
EBOM-2009 MRc7:Solid waste management - ongoing consumablesposted by Agnieszka Rylska on
I am working on two projects which will be certified separately. They are located next to each other and they share waste area and waste bins.
anticipated annual total ongoing consumables purchases
EBOM-2009 MRc1:Sustainable purchasing - ongoing consumablesposted by Agnieszka Rylska on
In the Reference Guide on page 254 in Table 1.