Exterior smoking policy

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Andrey Tsvetkov  on 

Dear all, We have a question about exterior non-smoking policy on the project NC.

1
Sat Aug 26, 2017, 8:38 pm

Air cleaning for IEQc3.1 Construction IAQ management plan

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Marina Radchenko  on 

We are going to apply for 1 point in credit IEQc3.1 but the Contractor is trying to avoid any ventilation during construction: - no natural ventilation - no ventilation by permanent system - no any

1
Fri Nov 27, 2015, 8:20 pm

Baselin Garage Ventilation

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, ASHRAE 62.1-2007 establishes a ventilation exhaust rate for garages of 0.7 cfm/sq.ft. Our project has lower rate and besides it applies a CO control settings of 20mg/m3. The question is:

0

Garage ventilation - Baseline

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, There are some more details about this issue, for which I'd appreciate very much some clarifications. Regarding the modeling approach for garage ventilation in the Baseline, it should fo

6
Wed Aug 23, 2017, 12:29 pm

Exterior lighting not yet designed

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, The project we are modeling at the moment is supposed to have exterior lighting for the facades, some parking lots and some walkways. The exact LPD however is still to be calculated and

4
Tue Jun 27, 2017, 2:23 pm

Baseline Garage Ventilation

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, In our project (registered as per LEEDv2009) there are several garage ventilations. According to ASHRAE 62.1-2007, the garage exhaust rate is to be sized to 0.75 cfm/ sq.ft.

3
Mon Jun 26, 2017, 6:43 pm

Baseline Hot water pump power for Purchased heat

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, The project we are modeling follows LEDD v3 - 2007 (System 7) and the heating source is purchased heat. There are two question related to this issue. 1.

3
Default Avatar
Vice President / Principal
2rw Consultants, Inc.
LEEDuser Basic Member
1 thumbs up
Wed Jun 21, 2017, 7:54 pm

Baseline Chiller plant - System7

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, Could you please provide some advice to the following case (the building belongs to System 7): 1.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue May 30, 2017, 12:47 pm

Lagre building modeling suggestion

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, The project we are modeling is a huge one - a little more than 900 000 sq ft and it is not C&S.

3
Thu May 11, 2017, 6:41 pm

Cooling plant modeling

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

In the project we are modeling the cooling plant which serves the production area and the buildings' HVAC systems is one and the same.

5
Fri Apr 29, 2016, 2:18 pm