Forum quick links
STC ratings of standard materials?
NC-v4 EQc9:Acoustic performanceposted by Erin Holdenried on
Hello - Is there a resource available with published STC ratings for standard/generic materials?
Thanks!
Service Hot Water - modeling the circulation pumps for this system
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings,
Regarding modeling the Service Hot Water (SHW) for a project assigned to System 5, our approach was:
Advertisements in Exterior Lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings,
We are modeling a KFC fast food restaurant.
As everybody is aware there are illuminated advertisement in the outdoor walls and some ad signs on the roof.
Baseline Design Air Flow - System 5
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
The project we are modeling belongs to System 5. There is however no cooling needed or designed.
n/a
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Anastasia Makarenko on
Hello all, I am confused how to identify one product that is going to be used on a concrete slab inside our project building.
Baseline Garage Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, ASHRAE 62.1-2007 establishes a ventilation exhaust rate for garages of 0.7 cfm/sq.ft. Our project has lower rate and besides it applies a CO control settings of 20mg/m3. The question is:
Distance from windows to area
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Rustem Saitov on
Hi, We are taking 3rd option, measurement to show compliance with the credit requirements. The text of the credit does not postulate when a regularly occupied area can be considered daylit (for in
Exterior smoking policy
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Andrey Tsvetkov on
Dear all, We have a question about exterior non-smoking policy on the project NC.
Air cleaning for IEQc3.1 Construction IAQ management plan
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Marina Radchenko on
We are going to apply for 1 point in credit IEQc3.1 but the Contractor is trying to avoid any ventilation during construction: - no natural ventilation - no ventilation by permanent system - no any
Baselin Garage Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, ASHRAE 62.1-2007 establishes a ventilation exhaust rate for garages of 0.7 cfm/sq.ft. Our project has lower rate and besides it applies a CO control settings of 20mg/m3. The question is: