Services inside a mall would do?

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Marcio Alberto Casado Pereira  on 

We have a project built right next to a shopping center. The shoppping center has more than the 10 basic services inside. WoIuld those 10 sevices qualify?

3
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Mon Mar 2, 2015, 3:03 pm

Option 1: Zoning and controls

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Diego Pietzsch  on 

I've been working in a LEED CI: Retail for a small store in a mall. I'm wondering to persue the option 1: zoning and controls for the project but i'm not sure if the sales floor of the store shoul

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jan 27, 2015, 11:41 am

Perimeter Controls

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Gabriela Mesquita  on 

Good day I want to consult in relation to a project in a lot of 10 hectares (about 25 acres) with a perimeter of 1377 m (about 4500 ft).

6
Wed Jan 14, 2015, 7:23 pm

PBE Edifica for EAp2 compliance

CS-2009 EAp2:Minimum Energy Performance
posted by  Mauricio Torres  on 

Hello, we are developing a strategy to reach a C&S 2009 certification for a commercial building in Brazil. I've read the following from the USGB website: EAp2 "Option 4.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jan 13, 2015, 3:25 pm

Stadium seating - need SRI? Is it an appurtenance/usable space?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Marcio Alberto Casado Pereira  on 

We just got a review from a stadium Project we are working on in Brazil and the review team asked us to double check the roof area considered, stating that part of our seating area covers enclosed

2
Tue Oct 28, 2014, 12:57 am

The missing point

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Cesar Ruiz  on 

Greetings, I am developing a exclusively residential project, and thus I realize that this credit is not applicable for my project.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Oct 22, 2014, 7:50 pm

Sediment Basin

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Paula Hernandez  on 

Hello again, we are working on a project for which we are installing a sediment basin. According to EPA we could use the calculation of 3600 ft3 / acre drained to size it.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Oct 16, 2014, 3:17 pm

External Lightning Exceptions

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi everyone, It is necessary to prove the power density in external illuminations with the following characteristics: - Accent lighting (lighting focused on plants and trees) - Lighting for vi

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 14, 2014, 12:54 pm

Time Setpoint No Met & Setback Temperatures

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi everyone! I've some doubts about this points. Whats is the setback temperatures? The time setpoint not met is calculated only in the occupied hours?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Oct 13, 2014, 5:09 pm