Beach as a basic service

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Lucas Bizelli  on 

We have a project in Rio de Janeiro that is near to the beach (between 1/2 mile).

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jan 22, 2016, 10:27 pm

HC near Airport

Healthcare-v2009 IEQc2:Acoustic environment
posted by  Saymon Grauppe  on 

Hello. I'm working on the design of a hospital and there is a doubt in the table 1.3-1 of the Sound & Vibration Guidelines FGI. The hospital is located 2600ft from the runway threshold .

2
Fri Jan 22, 2016, 9:54 pm

Heating System G3.1.10 ( c )

CS-2009 EAp2:Minimum Energy Performance
posted by  Nicolas Martinez Ochoa  on 

Hello, I’m working on a Core & Shell office building in Bogota and the baseline system is 8.

3
Wed Jan 20, 2016, 5:54 pm

Hangar

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gustavo De las Heras Izquierdo  on 

My project is a 93,000 sf open-plan hangar. We are designing grills on walls that count for 4% of the floor area on 2 opposite facades to induce crossed-ventilation.

5
Tue Dec 22, 2015, 1:09 am
2
Mon Dec 7, 2015, 11:45 am

Section 6.4.1.2, crossed ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Gustavo De las Heras Izquierdo  on 

I don't know how to interpret the following section of ASHRAE 62.1-2010: "6.4.1.2. Double side openings.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Fri Nov 13, 2015, 11:49 pm

Major renovations

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Veronica Reed  on 

Hello, what level of intervention would constitute as "Major Renovation"?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 30, 2015, 6:04 pm

Lighting Power Densities for an auditorium

NC-2009 EAp2:Minimum Energy Performance
posted by  Alan Viale  on 

Hi LEED experts! There is an auditorium in my project, also there will be a stage and a rehearsal.

3
SUMAC Latinoamerica SAC
LEEDuser Basic Member
6 thumbs up
Thu Sep 24, 2015, 8:19 pm

calculator v06

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  M. Galvao  on 

Hi, I'm using for the first time the "water use reduction calculator v06" and I have a question about the table "flush fixtures". When I have a toilet male, a toilet female and a urinal, what is t

2
Sustainability Analyst
ETC Group
LEEDuser Basic Member
8 thumbs up
Thu Aug 27, 2015, 6:16 pm

Baseline ventilation rates

NC-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

When the project is pursuing the increase ventilation which ventilation rates have to be used for the baseline 62.1 or 62.1 + 30%? I am working in LEED V2009. ASHRAE 90.1-2007

3
Default Avatar
PROJECT MANAGER
SOLUCIONES ENERGETICAS SOSTENIBLES
LEEDuser Basic Member
7 thumbs up
Tue Aug 25, 2015, 5:26 pm