Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Zone Calculation Ds% for VAV System

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Marina Andrade  on 

I received this question in IEQp1: "The ventilation calculations indicate that the value of the flow rate of air projected under the condition tested (DS) was modeled as 100% level for each of th

1
Mon Nov 17, 2014, 3:08 pm

Wall Skirting - or - Baseboards

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Blanca Cespedes  on 

I have a vinyl baseboard, does it also have to be Floorscore? Thanks,

0

2 Buildings in the same lot

CS-2009 MPR3:Must use a reasonable site boundary
posted by  Guillermo Alonzo  on 

Hello from Colombia, We have a C&S Project that has two different buildings (Hotel and offices building) in the same boundary.

0

Demolition records lost

NC-2009 MRc2:Construction waste management
posted by  Lara Branco  on 

Hello, I'm working on a project that has lots of demolition phases, because it depends on the expropriation of several buildings. The first demolition occurred in 2011, when the project wasn't yet

1
Fri Oct 9, 2015, 3:58 pm

ieqc8.1 x ieqc 8.2

NC-2009 IEQc8.2:Daylight and views - views
posted by  GISELA FARHAT DE ARAUJO  on 

to achieve this credit we must have won the ieqc8.1 credit? or credits are independent?

1
Wed Jan 18, 2017, 5:21 am

Supermarket in a small neighbourhood

NC-2009 SSc2:Development density and community connectivity
posted by  Heraldo Muñoz  on 

Hello, My name is Heraldo and I am certifying a Supemarket under LEED Retail NC 2009 This supermarket is being constructed in a shopping center that is close to a little neighbourhood. We are a

0

Carbon Dioxide Monitors

EBOM-v4 EQc2:Enhanced indoor air quality strategies
posted by  sebastian castañeda  on 

I currently have installed co2 sensors in densely occupied rooms located to the specifications mentioned in the OM LEED V4 Ref Guide.

1
Mon Aug 28, 2017, 10:07 pm

EBOM Project Occupancy Doubt

EBOM-2009 IEQp1:Minimum indoor air quality performance
posted by  Marina Andrade  on 

Hi everyone, I’m working on a project and I have a doubt about occupancy in the EBOM. After the measurements, we found that the air conditioning system does not meet the external ventilation lev

1
Mon Dec 8, 2014, 2:56 pm

100% On site Infiltration

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Rodrigo Tonda  on 

Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).

1
Fri Nov 27, 2015, 3:05 am

Withered grass

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  Gustavo De las Heras Izquierdo  on 

Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.

1
Fri Nov 27, 2015, 3:13 am