Forum quick links
Zone Calculation Ds% for VAV System
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Marina Andrade on
I received this question in IEQp1: "The ventilation calculations indicate that the value of the flow rate of air projected under the condition tested (DS) was modeled as 100% level for each of th
Wall Skirting - or - Baseboards
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Blanca Cespedes on
I have a vinyl baseboard, does it also have to be Floorscore? Thanks,
2 Buildings in the same lot
CS-2009 MPR3:Must use a reasonable site boundaryposted by Guillermo Alonzo on
Hello from Colombia, We have a C&S Project that has two different buildings (Hotel and offices building) in the same boundary.
Demolition records lost
NC-2009 MRc2:Construction waste managementposted by Lara Branco on
Hello, I'm working on a project that has lots of demolition phases, because it depends on the expropriation of several buildings. The first demolition occurred in 2011, when the project wasn't yet
ieqc8.1 x ieqc 8.2
NC-2009 IEQc8.2:Daylight and views - viewsposted by GISELA FARHAT DE ARAUJO on
to achieve this credit we must have won the ieqc8.1 credit? or credits are independent?
Supermarket in a small neighbourhood
NC-2009 SSc2:Development density and community connectivityposted by Heraldo Muñoz on
Hello, My name is Heraldo and I am certifying a Supemarket under LEED Retail NC 2009 This supermarket is being constructed in a shopping center that is close to a little neighbourhood. We are a
Carbon Dioxide Monitors
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by sebastian castañeda on
I currently have installed co2 sensors in densely occupied rooms located to the specifications mentioned in the OM LEED V4 Ref Guide.
EBOM Project Occupancy Doubt
EBOM-2009 IEQp1:Minimum indoor air quality performanceposted by Marina Andrade on
Hi everyone, I’m working on a project and I have a doubt about occupancy in the EBOM. After the measurements, we found that the air conditioning system does not meet the external ventilation lev
100% On site Infiltration
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Rodrigo Tonda on
Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).
Withered grass
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Gustavo De las Heras Izquierdo on
Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.