Forum quick links
PI Form 2: MPR7
CI-2009 MPR7:Must comply with a minimum building area to site area ratioposted by Aline Luther on
For a project of a commercial interior (commercial office in a commercial building) the gross floor area correspond to the total area of the office?
Lighting Power Density requirement for Tenant spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Pedro Urazan on
Hi, Is it required that the Tenants comply in their lighting designs with the Lighting Power Density requirement of ASHRAE 90.1 2007?
government areas
NC-2009 SSc2:Development Density and Community Connectivityposted by patricia vasconcellos on
I have a project that is in a government area. A region of the city that has been set aside to house all the public departments.
2012 EPA CGP comply with this prerequisite?
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Pamela Svetllana Santos Souza on
I'm modelling for LEED C&S 2009 and the project has 26 floor type of mixed-use offices. Does the 2012 EPA CGP can be used instead of 2003 EPA CGP to comply with this prerequisite?
Building Type
NC-2009 EAc2:On-Site Renewable Energyposted by Geraldine Assmus on
I'm trying to certify a Retail Store under LEED ID-Retail 2009 in Buenos Aires, Argentina. There is no info in Leed User for this credit.
Correct spelling for Miranda
posted by Andres Schwarz on
The correct spelling for the new LEED Fellow from Edificio Verde SA is Renato Miranda (full name: Renato Miranda Ibañez: http://www.edificioverde.com/index.php?sec=equipo). Mr.
Oriented Strand Board - OSB
CI-2009 MRc6:Rapidly Renewable Materialsposted by Lorenna Lobo on
Hi, is the oriented strand board - osb considered as rapidly renewable?
Multiple Building HVAC system
posted by Paula Hernandez on
Hello, We have two buildings in the same Project boundary, as far as I understand, this would be a Group Building Certification. The HVAC system will be variuous VRF systems, each for each floor of
LEED v3 2009 certification in 2018
posted by Vanessa Montezuma Ramos on
Hi everyone, I just started the certification of a laboratory building on LEED v3 2009.
Non Local Supplier
CS-2009 MRc6:Certified Woodposted by Jose Antonio Kovacevic on
Hi, We have a non local supplier.