Forum quick links
100% On site Infiltration
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Rodrigo Tonda on
Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).
Energy Star Alternative
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Cesar Ruiz on
A refrigerator labeled 'California Energy Commission Certificated' is valid as an alternative for an Energy Star qualified equipment?
Exempt area of 10% in a Group Project
posted by Gabriel Frasson on
We have a site that contains two buildings that are being certificate as a campus project. In the ground floor of Tower A there are some stores that we want to exempt of the certification project (
LEED V4 - TENANT SPACE ENERGY MODELING
Retail-CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi, Regarding the Energy Performance Calculator that should be used instead of Table 1.4, my questions are: 1.
AHUs unable to meet case 1 or case 2
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patrick Murisset on
Hello. I coordinated a project in which the IEQp1 was audited.
Diverse uses located within LEED project boundary
CS-v4 LTc6:Bicycle facilitiesposted by Ricardo Sá on
I'm working on a shopping center development that will include at time of occupancy more than 10 diverse uses within project boundary.
Deadline for Appeal
posted by Marcio Alberto Casado Pereira on
Hi Folks, We received the final decisiona on a very complicated industrial building we are pursuing certification for and EAp2 and IEQp1 were denied.
Core & Shell Retrofit
CS-v4 SSc1:Site assessmentposted by Juliana Malho on
I'm wondering if the credit is achievable by retrofit projects.
One single building
NC-2009 PIf1:Minimum Program Requirementsposted by MKK LEED on
We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,
Bicycle requirement
NC-v4 LTc6:Bicycle facilitiesposted by Veronica Reed on
Hello, we are working on a very small 12 room hotel in a historic landmark building, and were considering moving the project from LEED v2009 to LEED V4, but find some issues with this credit requir