Forum quick links
Social equity within the community
NC-v4 INc1:Innovationposted by Miriam Ramirez Baumgarten on
Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.
Carbon Dioxide Monitors
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by sebastian castañeda on
I currently have installed co2 sensors in densely occupied rooms located to the specifications mentioned in the OM LEED V4 Ref Guide.
Deadline for Appeal
posted by Marcio Alberto Casado Pereira on
Hi Folks, We received the final decisiona on a very complicated industrial building we are pursuing certification for and EAp2 and IEQp1 were denied.
Core & Shell Retrofit
CS-v4 SSc1:Site assessmentposted by Juliana Malho on
I'm wondering if the credit is achievable by retrofit projects.
Energy Star Alternative
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Cesar Ruiz on
A refrigerator labeled 'California Energy Commission Certificated' is valid as an alternative for an Energy Star qualified equipment?
Exempt area of 10% in a Group Project
posted by Gabriel Frasson on
We have a site that contains two buildings that are being certificate as a campus project. In the ground floor of Tower A there are some stores that we want to exempt of the certification project (
LEED V4 - TENANT SPACE ENERGY MODELING
Retail-CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi, Regarding the Energy Performance Calculator that should be used instead of Table 1.4, my questions are: 1.
AHUs unable to meet case 1 or case 2
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patrick Murisset on
Hello. I coordinated a project in which the IEQp1 was audited.
Diverse uses located within LEED project boundary
CS-v4 LTc6:Bicycle facilitiesposted by Ricardo Sá on
I'm working on a shopping center development that will include at time of occupancy more than 10 diverse uses within project boundary.
Brownfield
CS-v4 LTc3:High priority siteposted by Antonio Macedo Filho on
Hi Tristan, I have a project in a Brownfield. The site had a fuel station for boats before, and on the new project the owner will keep one fuel station, but now, it will be underground.