Forum quick links
Cooling tower cycles
Pilot-Credits WEpc17:Cooling tower water useposted by Phuc Do on
Hi all, Our project is using Munters cooling tower in which the cooling tower cycles measured continuously and the dump cycle adjusted accordingly.
Park aquatic and recreation
posted by Bouygues Sustainability on
Hello, I was wondering under which LEEDv4 we can certify an Aquatic Park in Australia. The project involves the establishment of a new aquatic and recreation centre and community parkland which wi
62.1 Theater Stage and Seating - Open spaces - 62.1 vent require
NC-2009 IEQp1:Minimum IAQ Performanceposted by Victoria Watson on
Hi, I have a theater space which has one single zone AHU serving the stage area and one single zone AHU serving the seating.
Showing Prescriptive Compliance for CRAC units
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Christie Rimes on
The CI project I am working on uses a CRAC unit and I was uncertain, which category CRAC units come under. If it is classified as Packaged Unitary Equipment then it needs to show compliance with E
Local Code more stringent - Pre req and IEQc2 documentation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Victoria Watson on
Hi, I am working on a large project in Australia that has used local code. The local code is more stringent than 62.1 however needs to be documented for the submission.
BD+C New Construction - New Stadium
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Quentin Jackson on
Hi all, I'm preparing to register a new project (new stadium) and would like to double check that it is a 'single building'.
System 4 for Data Center
NC-2009 EAp2:Minimum Energy Performanceposted by Ameet AA on
Hello, I'm modelling a low-rise data center. According to Appendix G, I should use system 4 (rooftop package heat pump) for reference model.
100% OA VAV Base Building system
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Christie Rimes on
Hi, the CI project I am working on uses only the base building system supply for meeting rooms with between 2 and 8 people.
ASHRAE 90.1 2007 Appendix G System Type 6
NC-2009 EAp2:Minimum Energy Performanceposted by deborah davidson on
We are working on a project which falls under the category of System 6 - Packaged VAV with PFP Boxes for the Baseline Building.
100% Outside Air systems
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Christie Rimes on
The base building HVAC system uses 100% outside air. Therefore there are no return grilles. I am assuming that the requirement for filtration then is not applicable?