enhanced refrigeration management credit

NC-v4 EAc6:Enhanced refrigerant management
posted by  david gordon  on 

can someone explain how/why a credit is achieved under the LEEDv4 , enhanced refrigerant management.

1
Tue Apr 28, 2015, 8:23 pm

Energy Modelling - Australia

NC-v4 EAp2:Minimum energy performance
posted by  Quentin Jackson  on 

We have a Green Building Council in Australia that has a very advanced energy simulation methodology that achieves the same outcomes as the ASHRAE 90.1 process outlined in LEED.

1
Thu Apr 13, 2017, 2:56 pm

Chain of Custody (COC) - Direct Delivery to Site

CI-2009 MRc7:Certified Wood
posted by  Christie Rimes  on 

We are procuring noggings that are FSC certified. The vendor doesn't have chain of custody certification.

1
Thu Oct 22, 2015, 1:24 pm

Cooling tower cycles

Pilot-Credits WEpc17:Cooling tower water use
posted by  Phuc Do  on 

Hi all, Our project is using Munters cooling tower in which the cooling tower cycles measured continuously and the dump cycle adjusted accordingly.

0

Park aquatic and recreation

LEED Rating System Selection
posted by  Bouygues Sustainability  on 

Hello, I was wondering under which LEEDv4 we can certify an Aquatic Park in Australia. The project involves the establishment of a new aquatic and recreation centre and community parkland which wi

1
Sat Aug 26, 2017, 8:09 pm

BD+C New Construction - New Stadium

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Quentin Jackson  on 

Hi all, I'm preparing to register a new project (new stadium) and would like to double check that it is a 'single building'.

2
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Wed Jun 7, 2017, 5:41 pm

System 4 for Data Center

NC-2009 EAp2:Minimum Energy Performance
posted by  Ameet AA  on 

Hello, I'm modelling a low-rise data center. According to Appendix G, I should use system 4 (rooftop package heat pump) for reference model.

3
Default Avatar
LEEDuser Basic Member
27 thumbs up
Fri Jun 10, 2016, 9:54 am

100% OA VAV Base Building system

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Christie Rimes  on 

Hi, the CI project I am working on uses only the base building system supply for meeting rooms with between 2 and 8 people.

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Sun Jan 10, 2016, 10:08 pm

ASHRAE 90.1 2007 Appendix G System Type 6

NC-2009 EAp2:Minimum Energy Performance
posted by  deborah davidson  on 

We are working on a project which falls under the category of System 6 - Packaged VAV with PFP Boxes for the Baseline Building.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Jan 6, 2016, 2:46 pm

100% Outside Air systems

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Christie Rimes  on 

The base building HVAC system uses 100% outside air. Therefore there are no return grilles. I am assuming that the requirement for filtration then is not applicable?

2
Thu Sep 10, 2015, 11:37 pm