Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Scope of credit

CS-v4 EQc3:Construction indoor air quality management plan
posted by  ilse angel  on 

During construction there is an stage when the contractor is building the slabs and columns of the levels above the ground floor.

1
Tue Mar 12, 2019, 10:09 pm

Development density of the surrounding residential zone or neighborhood (units/hectare) CALCULATION.

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Guillermo Hernandez Espinoza  on 

Hi, we are pursuing the option 2 and we have no problems selecting the 10 basic services within a 1/2 mile since we are located on an urban core area. 

0
1
Wed Feb 6, 2019, 2:41 am

DHW limitations

NC-2009 EAp2:Minimum Energy Performance
posted by  Jorge Lopez de Obeso  on 

Hi, I've been having some trouble regarding DHW modeling.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jan 22, 2019, 10:01 pm

Ozone treatment

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Gabriela Crespo  on 

Dear all, We are working on a project where the ozone levels exceed the most recent three year average, so we must include air-cleaning devices for ozone.

3
BECxP, CxA+BE, LEED AP BD+C, O+M
Revitaliza Consultores
LEEDuser Basic Member
18 thumbs up
Fri Jan 11, 2019, 2:04 pm
1
Fri Feb 1, 2019, 5:52 pm

Prerequisites on Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Andrés Felipe Sánchez Sánchez  on 

For version 4, Is it possible to send the Design Final Review without documenting one or more prerequisites.

1
Mon Dec 17, 2018, 3:34 pm

Location of recycling bins

Retail-CI-v4 MRp1:Storage and collection of recyclables
posted by  Alicia Villanueva  on 

I have a retail project, that is a makeup store, so the space is divided in two main areas, the first one is operation area (staff only) and second one is a store area (sales floor), on the store a

1
Wed Nov 28, 2018, 6:00 pm

LPD for covered (open) mechanical room

CS-2009 EAp2:Minimum Energy Performance
posted by  Jorge Lopez de Obeso  on 

We're working on an energy modeling configuration and  filling the Section 1.4 Table: The project includes a mechanical room on the roof floor which is not entirely unclosed, it has

1
Fri Nov 23, 2018, 6:21 pm

LEED CI v4 in a CS V2009

CI-v4 IPc1:Integrative process
posted by  Gabriela Mena   on 

Hi, We are designing a Commercial Interior v4 Space in a building that is already certified under CS v2009 with a Platinum level.

3
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Nov 8, 2018, 2:41 pm