Forum quick links
Development density of the surrounding residential zone or neighborhood (units/hectare) CALCULATION.
CS-2009 SSc2:Development Density and Community Connectivityposted by Guillermo Hernandez Espinoza on
Hi, we are pursuing the option 2 and we have no problems selecting the 10 basic services within a 1/2 mile since we are located on an urban core area.
Compliance without showers on a mixed used project ( MAINLY RSIDENTIAL)
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Guillermo Hernandez Espinoza on
Hi everyone.
Is there anyway to comply if parking spaces is provided for bikes but no showers?
DHW limitations
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hi, I've been having some trouble regarding DHW modeling.
Ozone treatment
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Dear all, We are working on a project where the ozone levels exceed the most recent three year average, so we must include air-cleaning devices for ozone.
Prerequisites on Design Review
posted by Andrés Felipe Sánchez Sánchez on
For version 4, Is it possible to send the Design Final Review without documenting one or more prerequisites.
Location of recycling bins
Retail-CI-v4 MRp1:Storage and collection of recyclablesposted by Alicia Villanueva on
I have a retail project, that is a makeup store, so the space is divided in two main areas, the first one is operation area (staff only) and second one is a store area (sales floor), on the store a
LPD for covered (open) mechanical room
CS-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
We're working on an energy modeling configuration and filling the Section 1.4 Table: The project includes a mechanical room on the roof floor which is not entirely unclosed, it has
LEED CI v4 in a CS V2009
CI-v4 IPc1:Integrative processposted by Gabriela Mena on
Hi, We are designing a Commercial Interior v4 Space in a building that is already certified under CS v2009 with a Platinum level.
Monitoring Plan
Pilot-Credits SSpc55:Bird collision deterrenceposted by Cynthia Fierro on
By completing the three-year monitoring plan, what would be the follow-up to the plan?