Forum quick links
Frequency of rides per day that have to be given by the shuttle
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Jorge Lopez de Obeso on
We are working on a project in which the nearest bus stop is just over a quarter mile so it is proposed to provide a shuttle service to take users to the bus stop.
Thermal controls for 50% occupants
CI-v4 EQc5:Thermal comfortposted by Gabriela Mena on
Hi, We have a project in Mexico City, the system is VRF and for the interior spaces we have Fan coil units, approximately 60% of the project area is open office space and it is complicated to pro
Bus parking space
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by jorge calderon on
To achieve ss.
Commissioning Requirements Off-site
posted by Alicia Villanueva on
Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.
Case2 Option 1- Labs
EBOM-2009 EAc1:Optimize energy efficiency performanceposted by Alicia Villanueva on
The project is an innovation center, it has offices (63%), laboratory (28%) and data center (8%), the lab represents more than 10% of the area, we have to use the USGBC Calculator Case 2 Option 1-
Project Mexico
NC-2009 PIf2:Project Summary Detailsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Energy Rater
posted by Gustavo De las Heras Izquierdo on
Hallo, we want to certify a home outside the U.S.
BMS
EBOM-2009 EAc2.3:Existing building commissioning - ongoing commissioningposted by Gustavo De las Heras Izquierdo on
Hallo, We are working on two projects located in Mexico DF. One of them doesn't have a BMS and the other has a BMS but it does not provide trend graphs.
Robotic Parking Garage Ventilation
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Gabriela Mena on
Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf
LEED Form MR 4
NC-2009 MRc4:Recycled contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?