Commissioning Requirements Off-site

Credit Forums
posted by  Alicia Villanueva  on 

Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.

0

Case2 Option 1- Labs

EBOM-2009 EAc1:Optimize energy efficiency performance
posted by  Alicia Villanueva  on 

The project is an innovation center, it has offices (63%), laboratory (28%) and data center (8%), the lab represents more than 10% of the area, we have to use the USGBC Calculator Case 2 Option 1-

1
Tue Sep 8, 2015, 12:29 pm

Project Mexico

NC-2009 PIf2:Project Summary Details
posted by  Alejandro Macias  on 

I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .

0

Tenant submetering

EBOM-2009 EAc3.2:Performance measurement - system-level metering
posted by  Gustavo De las Heras Izquierdo  on 

I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.

1
Mon May 2, 2016, 5:59 pm

SR Natural stone

NC-v4 SSc5:Heat island reduction
posted by  Juan Carlos Contreras  on 

Hello, About the option 1 Nonroof and Roof, we are using a natural Stone (local material), Off-White color, for the pavement in the main square and walkway.

1
Tue Jul 19, 2016, 7:29 pm

Documentation required

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Gustavo De las Heras Izquierdo  on 

Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU.

1
Thu Aug 31, 2017, 11:58 pm

LEED Form MR 4

NC-2009 MRc4:Recycled content
posted by  juan pena  on 

The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?

1
Sat Aug 26, 2017, 5:34 pm

Role

LEED for Homes (LEED-H) Forum
posted by  Gustavo De las Heras Izquierdo  on 

Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the

1
Mon Nov 9, 2015, 2:41 pm

% of Glazing & Floor Area Base Case vs Project

CS-2009 EAp2:Minimum energy performance
posted by  Dana Guzman  on 

Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question.

1
Fri Jun 17, 2016, 3:00 am

Demonstrate Savings for CRAC Units

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Gabriela Crespo  on 

Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.

1
Sat Aug 6, 2016, 6:33 pm