Project Mexico
NC-2009 PIf2:Project Summary Detailsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Energy Rater
posted by Gustavo De las Heras Izquierdo on
Hallo, we want to certify a home outside the U.S.
BMS
EBOM-2009 EAc2.3:Existing building commissioning - ongoing commissioningposted by Gustavo De las Heras Izquierdo on
Hallo, We are working on two projects located in Mexico DF. One of them doesn't have a BMS and the other has a BMS but it does not provide trend graphs.
Robotic Parking Garage Ventilation
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Gabriela Mena on
Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf
LEED Form MR 4
NC-2009 MRc4:Recycled contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?
Role
posted by Gustavo De las Heras Izquierdo on
Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the
Tenant submetering
EBOM-2009 EAc3.2:Performance measurement - system-level meteringposted by Gustavo De las Heras Izquierdo on
I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.
SR Natural stone
NC-v4 SSc5:Heat island reductionposted by Juan Carlos Contreras on
Hello, About the option 1 Nonroof and Roof, we are using a natural Stone (local material), Off-White color, for the pavement in the main square and walkway.
Documentation required
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU.
LEED O&M on a portion of a building
EBOM-v4 MPR3:Must comply with project size requirementsposted by LEED Pro Consultant on
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?