Forum quick links
Massage/Sauna/Swimming pool
NC-2009 IEQc8.2:Daylight and views - viewsposted by LEED Pro Consultant on
Hello, we are working on a residential project and we would like to know if amenities such as sauna, massage and swimming pool areas are considered as regularly occupied areas. Thank you.
LEED NC v2009: Innovation Design
NC-2009 MRc2:Construction waste managementposted by Paola Medina on
Batteries from other company could be encapsulated with concrete in the fund elevators instead of send to landfills?
Project Mexico
NC-2009 PIf4:Schedule and Overview Documentsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Credit 7.1 and 7.2
NC-2009 SSc7.1:Heat island effect - nonroofposted by Alejandro Macias on
I am working on a dormitory Project and it has different buildings (one for the kitchen, one for administration, girls dormitory….).The roof of this buildings are connected with each other, so almo
Requirements for instant water heater with no storage tank
NC-2009 EAp2:Minimum energy performanceposted by Gustavo De las Heras Izquierdo on
Hallo, I have read the insulation requirements in Section 7.4.3 but it seems to focus on circulating and non-circulating systems with a storage tank.
MERV filters
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Is there any mandatory filter efficiency requirement (MERV) for projects located in areas with a very high PM2.5 levels? Is it mandatory for ASHRAE 62.1-2010 requirements?
LOW VOC Comply
CI-v4 EQc2:Low-emitting materialsposted by Brigitte Solis W on
Hi, I am completing the VOC calculator, but if I put a product with the maximum allowed value it does not comply. For example if they ask for 70 and my product has 70 for v4 is not fulfilling?
Balancing Devices to meet ASHRAE 90.1 Mandatory Requirements
NC-2009 EAp2:Minimum energy performanceposted by Jorge Torres-Coto on
We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system. We are informing the CxTeam that it is required to have b
About disturbance considerations for retention walls.
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Mauricio Ramirez on
Hi everyone: I have a Project that needs to have large retention walls close to the office and main acces road.
Alternative Compliance Path
CS-2009 EAc1:Optimize energy performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the