Forum quick links
Smoking Rules within construction project boundaries
NC-v4 EQc3:Construction indoor air quality management planposted by Marine Petrosyan on
Hi, All!
We are currently facing two major questions during the work with the construction project team.
Interior Project Water Performance
EBOM-v4.1 WEc1:Water Performanceposted by yingling guan on
For interior project, if there is only one pantry faucet within the project scope. And occupants of this project will use other indoor water fixtures or fittings installed out of the thi
Quality Views from Skylight
Pilot-Credits EQpc117:Quality views in nonregularly occupied spacesposted by Yifeng Xu on
Hi All,
We have one project with skylight on the roof and thinking if it is eligible as the quality view. Considering:
Water bottle drinking fountain - water usage
NC-v4 WEc2:Indoor water use reductionposted by Erin Rowe on
I see that water-bottle fill stations / drinking fountains are not on the list of fixtures in the calculator. Do we just leave those out of the water savings calculations?
Fenestration assembly U value
NC-2009 EAp2:Minimum Energy Performanceposted by Sivarajah Ragulakeethan on
Dear All,
Waste to energy in LEED v3
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Darya Lukicheva on
Hello. I'm now working on a large project (180 000 m2) certification under LEED 2009 NC.
Limiting site disturbance
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Michael Smithing on
We have a site which meets the definition of greenfield. It was previously in agricultural use, and is now located in an industrial park.
EA advanced Energy metering credit (LEED v4)
NC-v4 EAc3:Advanced energy meteringposted by Angelina Ten on
Dear all, Currently I have a project where energy meters comply with all the corresponding credit requirements except that they do not display energy demand.