NC-v4 SSp1:Construction activity pollution preventionposted by André Harms on
A potential LEED project in Addis Ababa, Ethiopia, had already begun demolition and some construction activities before a LEED AP was appointed.
Stormwater Management in a project without pre-existing infrastructure
NC-v4 SSp1:Construction activity pollution preventionposted by Amine Zeidane on
Hello,
I'm working on a mixed-use tower construction project in Morocco.
Applying MRp2 retrospectively
NC-v4 MRp2:Construction and demolition waste management planningposted by André Harms on
A potential LEED project in Addis Ababa, Ethiopia, had already begun demolition and some construction activities before a LEED AP was appointed.
SRI
NC-v4 SSc5:Heat island reductionposted by zakir hossain on
Can i know what is 3 year aged SRI.
is it a gradation of roofing material?
Optimize energy on Datacenter equipments
NC-v4 EAc2:Optimize energy performanceposted by Amine Zeidane on
Hello,
What are the main topics in construction documents that should include LEED requirements ?
NC-v4 IPc1:Integrative processposted by Amine Zeidane on
Hello,
Is there a document out there to assist in what should be written in construction documents tenders destined for the Construction and MEP companies ?
Thank you
Is underground Parking included in Certification fees calculations ?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Amine Zeidane on
Hello,
I have an office building project with the following data :
Total GFA (3 underground parking levels + 8 levels above the floor) : 83 108 sf
Bench marking for Option 2.
EBOM-v4 WEp1:Indoor water use reductionposted by Tiffany de Klerk on
Hi, I am quite confused as to how to calculate compliance for Option 2 Metered Water Use. We have the consumption data for 12 months for a building however the calculator is only for Option 1.
Data Center Minimum Requirement of 2%
NC-v4 EAp2:Minimum energy performanceposted by Amine Zeidane on
Hello,
Warehouse project failed LEED BD+C certification wants to try again
posted by Amine Zeidane on
Hello,
A Warehouse project failed LEED BD + C certification in 2011 and wants to try again in 2018 with the same Building and for minimum cost.