Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

50 foot setback

NC-2009 SSc1:Site selection
posted by  Farah A.  on 

Do ponds need to meet the 50 ft setback? I understand small man made ponds for recreational, fire supression or stormwater retention purposes are exempt from this setback. Anyone know if these ar

1
Thu Mar 6, 2014, 12:12 am

Mix Use Development

LEED Rating System Selection
posted by  Patrick Lee  on 

I am working on a project with equal floor space distribution of apartments, hotel and offices. It will consist of 2 towers and shared underground carparking facility. The owner will lease the hote

1
Sat Mar 8, 2014, 2:52 am

Single Zone served by 2 HVAC systems

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Nandana Kumar  on 

Hi, In our project, a particular zone (Board Room) is being served by 2 systems: central chiller plant through an AHU & by Cassette Units.

1
Wed Mar 5, 2014, 12:19 am

Pre-occupancy Cleaning

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Maggie Pipek  on 

If you are not pursuing a green cleaning credit, is there anywhere in the credits (IEQc3.1/IEQc3.2 Construction IAQ Management Plan or elsewhere) that dictate requirements for post-construction/pre

1
Mon Mar 3, 2014, 4:38 pm

Loading Docks

EBOM-2009 IEQc3.5:Green cleaning - indoor chemical and pollutant source control
posted by  Michael McPheron  on 

Our project consists of a manufacturing facility with 3 loading docks. These docks do not currently have an entryway system.

1
Thu Mar 6, 2014, 3:34 pm

The RPCs have been updated

General forums
posted by  Jean Marais  on 

Hi chaps, the international RPCs have been updated. http://www.usgbc.org/rpc/LEED-NC/v2009/

0

Support an Existing Farm

Pilot-Credits SSpc82:Local food production
posted by  Tess Doeffinger  on 

In order for a school to meet Option 3: Supporting a local Farm, does there have to be both a financial contribution and volunteering involved or can it just be one of them?

1
Tue Apr 8, 2014, 1:30 pm

Pilot credit "Walkable Project Sites" double-dips with SSc2?

NC-2009 SSc2:Development density and community connectivity
posted by  GTF CPRE  on 

Our campus student union is considering an Innovation Credit using v4 pilot credit 14: Walkable Project Sites.

1
Thu Mar 6, 2014, 4:00 pm

Acetone Based Dye Stains

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Rebecca Bryant  on 

I read the string of comments on acetone being used as a floor stripper in polished concrete applications.

1
Sat Mar 8, 2014, 3:15 am

Audit Documentation

EBOM-2009 IEQc1.1:Indoor air quality best management practices - indoor air quality management program
posted by  Trevor Gilbert  on 

I am working on an office building that is 16 floors with each floor approximately 18,000 sf.

1
Mon Nov 30, 2015, 8:53 pm