Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Achieving credit ( 1 Innovation point?) for having a Green Cleaning Policy with a NC K-12 School Project

NC-v4.1 INc1:Innovation
posted by  Michael McDonald  on 

A few years back on NC Projects Achools were able to achieve 1 Innovation Point on NC Projects by Implementing a Green Cleaning Policy.

0
2
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Tue May 5, 2020, 12:10 pm

Underground warehouse on prime farmland

Warehouses-NC-v4 LTc2:Sensitive land protection
posted by  Michele Di Martino  on 

Hello everybody, I'm dealing with a project of a new underground warehouse that is going to be developed on an existing prime farmland.

1
Wed May 6, 2020, 3:58 pm

Changing Total Gross Floor Area in PIf2 during Preliminary Design Review

NC-2009 PIf2:Project Summary Details
posted by  Edgar Arevalo  on 

I'm currently going through the preliminary design review credits, and I was stumped on the comment for IEQp1: Minimum Indoor Air Quality Performance surrounding the 40,198 sq. ft.

1
Fri Jun 5, 2020, 4:41 pm

Change LEED boundary after Design Review?

NC-2009 PIf2:Project Summary Details
posted by  Joyce Kelly  on 

LEED boundary encompassing 130 acres was established by Civil to include all stormwater treatment. Following Prelim.

2
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Tue May 5, 2020, 6:49 am

Off-iste reuse: donate recyclable materials to employees who need?

NC-v4 MRc5:Construction and demolition waste management
posted by  Thomas Tran  on 

Dear All,

We attempt for the MRc5 Construction and Demolition Waste Management.

2
Sustainable Consultant
INSPEC Sustainability Group LLC
LEEDuser Premium Member
43 thumbs up
Tue May 5, 2020, 1:33 am
3
Mon May 4, 2020, 5:08 pm

V4 IAQ ventilation rate

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Jerry Young  on 

I am working on a project using the V4 CI rating stsem. For IAQ ventialtion rate, the standard references and has the calculator for using 62.1 2010 or 2013.

0

Both Option 1 & Option 2 achievable

NC-v4 LTc3:High priority site
posted by  Muge Karasahin  on 

Hello,

Our project site qualifies both for Option 1. Historic District and Option 2. Priority Designation of the credit. Is it possible to claim two points for this credit?

3
Mon May 4, 2020, 3:11 pm