a great addition for user comfort
Pilot-Credits EQpc47:Acoustic comfortposted by Abbie Ford on
LEED for Homes seems to take a step back from user comfort compared to some of their other rating systems, and I believe this is a successful way to encourage architects to design for their user.
Designated Smoking areas inside the building
EBOM-v4.1 EQp2:Environmental Tobacco Smoke Controlposted by Amal Venugopal on
Hi , I m looking for a clarification on alternative compliance path for complying the prerequisite Environmental Tobacco Smoke Control under LEED v4.1 O M rating system.
LEED O&M v4.1
posted by Summer Gorder on
I am working on multiple LEED BD&C version 4 projects, but starting my first O&M project.
Private shuttle
NC-v4 LTc5:Access to quality transitposted by Dora Rebola on
We have an office building and retail that is located in an area that provides a good public transport services during the week, but not on the weekends.
EQc6 - Interior Lights (ROS & LRV conflicts)
NC-v4 EQc6:Interior lightingposted by Olawale Taiwo on
There is quite an issue of concern on LRV weighted average calculations on our project per the EQc6 credit, as the project team requires an urgent response to this, please see details bel
Uplight requirements
NC-v4 SSc6:Light pollution reductionposted by Ricardo Sá on
Dear All,
In what refers to uplight requirements – Option 2 (calculation method) implies limits to the percentage of total lumens emitted above horizontal.
Nonattainment area for PM2.5
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Sarah Birchall on
How do I find out if my project (which is located in the UK) is in a nonattainment area for fine particulate matter (PM2.5)?
Can I use a mezzanine in MRF to add floor area?
CS-v4 MRp1:Storage and collection of recyclablesposted by Van Jomel Garcia on
I have a question regarding MRF, the minimum size calculated for the MRF is 47 sqm.
Is documentation of NO contract required?
Pilot-Credits SSpc129:Comprehensive Compostingposted by Annalise Dum on
Hi all,
Is documentation that no contract is required from the hauler required as proof for this credit?