Forum quick links
Specification language for tribally owned and managed forests
posted by Heather DeGrella on
Hi all - I am in need of specification language for wood sourced from tribally owned and managed forests. Does anybody have examples they would be willing to share? I would be so greateful!
TallyCAT Help
posted by Amanda Spice on
Hi Everyone - I hope this isn't a repeat topic. We are starting to get familiar with TallyCAT at SAR+ and have a few people testing our projects in it.
Additional Source Control and Monitoring; sensor locations
NC-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by Chris Flint Chatto on
Wondering what this credit requires for location of IAQ sensors. Trying to evaluate for a large, "laboratory-like" project with many spaces that have potential pollutants. I understand
Downstream Implementation of Analysis Outcomes
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Charles Boechler on
This is such a critical part of informing plan decisions in relation to the marketplace value or buyer acceptance.
Seed Evaluator Tool Effectiveness?
Pilot-Credits IPpc89:Social equity within the communityposted by Charles Boechler on
Is the Seed Evaluator the best tool for measuring social equity?
Relevant Trades/Contractors at Project Planning Stage
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Charles Boechler on
From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key individ
How many tests per square foot?
NC-v4 EQc4:Indoor air quality assessmentposted by Samantha Lee on
Hi all!
Interior element reuse in different project
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Nadia Azzam on
Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED).
Minimum Survey respond reached but no score avilable
EBOM-v4.1 LTp1:Transportation Performanceposted by Michael Ling on
Good Day ! I would like to ask if anyone experienced that before:
Water Calcultion for Commerical ID+C project
CI-v4 WEc1:Indoor water use reductionposted by Amgad Khattab on
We have a project with the following :
- Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area.
Hint: