Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LPD for IT Rooms and IT Closet

CI-v4 EAp2:Minimum energy performance
posted by  Edgar Arevalo  on 

So according to 2010 ASHRAE 90.1, there is no LPD requirements for IT closets.  Yet the lighting for the project in question was adhereing to the ASHRAE 2016 90.1 standard, which has a space t

1
Sun Oct 8, 2023, 3:03 pm
1
Sat Oct 7, 2023, 5:59 pm

Heat Rejection and Cooling - Lab Equipment Process Water Use

NC-v4 WEp2:Indoor water use reduction
posted by  Allison Wilson  on 

In the case of lab equipment such as sterilizers and lab glassware washers, water is frequently super-heated and recirculated within the chamber to achieve cleanliness and sterilization which appea

1
Fri Oct 6, 2023, 4:07 pm

Anti-Ligature fixtures

NC-v4 WEp2:Indoor water use reduction
posted by  Leanne Conrad  on 

The reference guide is clear that special or unique water closets can be excluded from the credit calculations, my query is does this expand to special or unique fixtures?

11
Default Avatar
Managing Partner
Salas O'Brien Canada Inc.
LEEDuser Premium Member
0 thumbs up
Thu Oct 5, 2023, 4:27 pm

Electrochromic Glazing for LEED v4 EQ 8.1 Quality Views Credit

NC-v4 EQc8:Quality views
posted by  Shalini Gali  on 

LEED v4 states that “View glazing in the contributing area must provide a clear image of the exterior, not obstructed by frits, fibers, patterned glazing, or added tints that distort color bal

4
Project Consultant
Sustainable Design Consulting, LLC
LEEDuser Premium Member
6 thumbs up
Thu Oct 5, 2023, 2:04 pm

No Exterior Lighting Query

EBOM-v4.1 SSc3:Light Pollution Reduction
posted by  Wafa Arif  on 

We have a high-rise building for which we are pursing LEED EBOM v4.1. Since that building only has an LED vertical columns lighting on the facade. Other than this no exterior fixtures are used?

3
Thu Oct 5, 2023, 1:42 pm

Pursuing Whole Project Pilot in residential buildings

Pilot-Credits WEpc115:Whole Project Water Use Reduction
posted by  Paul Erlichman  on 

Hello,
I posed a similar question in the forum for the Optimize Proces Water Use credit, but I figured I would post an addendum of sorts in the pilot credit forum.

0

Occupant comfort survey and transportation survey

EBOM-v4.1 EQp4:Indoor Environmental Quality Performance
posted by  Jayaprasad ramamoorthy  on 

We are currently working on the prison project for LEED existing building certification.

0

Should the soil be previously disturbed, before the owner starts to do anything with it?

CS-v4 SSc2:Site development - protect or restore habitat
posted by  Marine Petrosyan  on 

Hi, All!

The Site Development - Protect or Restore Habitat credit requires, that the calculations are done with the previously disturbed land.

1
Tue Apr 23, 2024, 1:02 am