Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Equipment Efficiency Section 1.4

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  John Kitsalis  on 

This section is a little confusing and I am putting my interpretation of it up.

1
Wed Sep 19, 2012, 3:35 pm

Informal Meeting Spaces

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  William Weaver  on 

Intermixed throughout our open office floor plan, we have included a number of casual seating arrangements to facilitate informal, impromptu meetings.

1
Fri Sep 21, 2012, 7:02 pm

NC or CS?

LEED Rating System Selection
posted by  Rosana Correa  on 

A building will be constructed to be occupied as a media center for about a year. After that period, the building will be renovated to be sold or rented to become an office building.

1
Thu Sep 27, 2012, 3:26 pm

Recycling in Malaysia

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Joel Cesare  on 

We have a LEED CI project in an office building in Kuala Lumpur and the local contractor is telling us there is no option to recycle.

1
Mon Dec 23, 2013, 7:58 pm

Loading Dock?

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  Patrick Culhane  on 

We are undertaking the space inventory in advance of our audit. The building is a +/- 1,000,000 sf office tower. I'm wondering if the audit needs to include the loading dock area.

1
Fri Nov 23, 2012, 8:23 pm

LEED-H, LEED-NC or LEED -EBOM?

LEED Rating System Selection
posted by  Kimberly Cullinane  on 

Client is considering LEED for 4-story college dormitory. We are planning on renovating the dorm, but this will not be a gut-renovation - no envelope work.

1
Thu Sep 27, 2012, 4:18 pm

which refrigerant

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Emmanuel Pauwels  on 

Our system has 2 different refrigerant types. One type in the compressor and another type in the refrigeration circuit.

1
Wed Sep 19, 2012, 1:53 pm

Residential Blower Door Test results

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Cory Benson  on 

Our Blower door tests of the residential top floor of a mixed use building reports the findings as Total Airflow through the door seals [m3/h] at a given pressure differential [Pa].

1
Fri Sep 28, 2012, 9:48 am

Supplemental Daylight & Views Calculation Spreadsheet

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Angie Allen  on 

Are you required to use the Supplemental Daylight & Views Calculation Spreadsheet available Credit Resources? Can we still use a spreadsheet as listed in the Documentation Toolkit here?

1
Thu Sep 20, 2012, 12:56 pm

RoHS

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Shevaun Barrie  on 

Does anyone know if LEED counts being RoHS compliant as being equal to NEMA compliance? Thank you, Shevaun

1
Fri Nov 23, 2012, 8:02 pm