Forum quick links
MRpc87 Verified Waste Pilot
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Michelle Rosenberger on
I am not sure that diversion rates are any better using the RCI facilities.
Common comments in review phase
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Diana Rueda on
Were there any common reviewer comments or documentation challenges that I should be aware of before submission?
Looking for BIS ISI Certification in India?
posted by Bl India on
If you are looking for BIS ISI Certification in India, it is important to understand whether your product
Onsite Carbon Sequestration Through Plantings - Pilot credits - SSpc158
posted by Evan Constant on
Option 1 for the Onsite Carbon Sequestration Through Plantings pilot credit requires showing the amount of CO2 sequestered by all trees and shrubs on the proposed site is at a minimum a 10% in
Monitoring Systems for Commercial Interiors projects
Pilot-Credits LTpc134:Advanced Transportation Monitoring Systemsposted by Jose Antonio Kovacevic on
Hi everyone, we are searching for pilots credits for a corporative office that wants to pursues LEED ID+C certification in a certified LEED BD+C Core and Shell Gold project.
Integrative Analysis of Building Materials - LEED v4 CS
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Jessica Glorius-Dangelo on
I found the information relatively easy to find with the documentation provided by the product manufacturers.
Integrative Analysis of Building Materials
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by on
The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.
Path 2 Envelope Loads - What software to use?
NC-v5 EAc2:Reduce Peak Thermal Loadsposted by Mark Benson on
The Reference Guide says that you must follow the 90.1 Section 5.6 Building Envelope Trade-Off Compliance Path and then extract system peak heating and cooling loads from the modeled outputs for th
Maximum Points
CI-v5 EQc5:Air Quality Testing and Monitoringposted by Erin Heidelberger on
The credit lists 4 points available but in looking through the language I see 1-2 points for Option 1 AND/OR 1 point for Option 2, which only provides 3 possible points.
Shower & Changing room - does it require a sink and toilet?
NC-v4 LTc6:Bicycle facilitiesposted by Todd Bundren on
I am working on a student housing project on a university campus. The majority of the building are resident rooms with some amenity spaces.