Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

MRpc87 Verified Waste Pilot

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Michelle Rosenberger  on 

I am not sure that diversion rates are any better using the RCI facilities.

1
Sustainable Design Director
Boulder Associates Architects
LEEDuser Premium Member
20 thumbs up
Wed Jun 17, 2026, 7:55 pm

Common comments in review phase

Pilot-Credits WEpc115:Whole Project Water Use Reduction
posted by  Diana Rueda  on 

Were there any common reviewer comments or documentation challenges that I should be aware of before submission?

0

Looking for BIS ISI Certification in India?

LEED Exam Discussion
posted by  Bl India  on 

If you are looking for BIS ISI Certification in India, it is important to understand whether your product

0

Onsite Carbon Sequestration Through Plantings - Pilot credits - SSpc158

LEED v4.1 Discussion Forum
posted by  Evan Constant  on 

Option 1 for the Onsite Carbon Sequestration Through Plantings pilot credit requires showing the amount of CO2 sequestered by all trees and shrubs on the proposed site is at a minimum a 10% in

2
Tue Jun 16, 2026, 8:47 pm

Monitoring Systems for Commercial Interiors projects

Pilot-Credits LTpc134:Advanced Transportation Monitoring Systems
posted by  Jose Antonio Kovacevic  on 

Hi everyone, we are searching for pilots credits for a corporative office that wants to pursues LEED ID+C certification in a certified LEED BD+C Core and Shell Gold project.

1
Tue Jun 16, 2026, 5:41 am

Integrative Analysis of Building Materials - LEED v4 CS

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Jessica Glorius-Dangelo  on 

I found the information relatively easy to find with the documentation provided by the product manufacturers.

0

Integrative Analysis of Building Materials

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by     on 

The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.

17
Mon Jun 15, 2026, 12:41 pm

Path 2 Envelope Loads - What software to use?

NC-v5 EAc2:Reduce Peak Thermal Loads
posted by  Mark Benson  on 

The Reference Guide says that you must follow the 90.1 Section 5.6 Building Envelope Trade-Off Compliance Path and then extract system peak heating and cooling loads from the modeled outputs for th

0

Maximum Points

CI-v5 EQc5:Air Quality Testing and Monitoring
posted by  Erin Heidelberger  on 

The credit lists 4 points available but in looking through the language I see 1-2 points for Option 1 AND/OR 1 point for Option 2, which only provides 3 possible points.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Fri Jun 12, 2026, 6:26 pm

Shower & Changing room - does it require a sink and toilet?

NC-v4 LTc6:Bicycle facilities
posted by  Todd Bundren  on 

I am working on a student housing project on a university campus. The majority of the building are resident rooms with some amenity spaces.

1
Sustainability Consultant | Senior Project Manager
Re:Vision Architecture
LEEDuser Premium Member
10 thumbs up
Fri Jun 12, 2026, 5:32 pm