How long do you have to do surveys?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Parker williams on
How long do you have to do surveys? Is this suppose to be ongoing forever?
EAp2-4: Energy Star equipment: conversion from kWa to Watts
CI-2009 EAp2:Minimum Energy Performanceposted by Sarah Simchuk on
I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for Rated Power in WATTS.
Rated power
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
From where can i take rated power for equipments like laptop , i read it on laptop about 55wh then i divded it by work hours give me 6.7watt , is that right ??????
M&V approach case 2 (75% or more of total building area)
CI-2009 EAc3:Measurement and Verificationposted by Gaston Michaud on
We were trying to pursue this credit by developing and implementing a M&V plan following option C from the IPMVP, but after reading some comments, it seems that this path was removed.
Clarification
CI-2009 EAc3:Measurement and Verificationposted by Redy Truccolo on
Hi Marcus, We've a LEED CS certified building in which the Tenant will occupy almost 100% of the total area, so we will fall in CASE 2. We obtained the CS certification EAc5.2 credit and we've sub
ITE Versioning Issues
posted by Alfred Miller on
Any update by USGBC on the versioning issues of the ITE Parking Generation Study?
Where to find the Ecologo-certified products?
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Helen Samuel on
Now that Ecologo was acquired by UL, where can I find which products are Ecologo-certified?
Molok Containers for MRp1
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Kristopher Lashley on
We are looking to install a 5000L Molok recycling bin for a LEED 2009 CS building that will be a restaurant. According to the reference guide a 11.6m recycling area would be required.
EV Ready acceptable?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Dylan Connelly on
For Core & Shell projects - is installing 3% of the parking stalls to be EV ready acceptable to achieve these points?