Forum quick links
New Bus Depot: LEED BD+C or C+S?
posted by Cynthia Kaplan on
My project is the new construction of a 3,000 s.f. bus depot in a small city. Part of the space will be leased to a retailer at a later date, most likely a convenience store or coffee shop.
Testing of units with the same layout
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Ilana Judah on
We are working on a large high-end high-rise residential project with a variety of unit sizes and layouts.
Actual Operation of Carpool parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Jatuwat Varodompun on
We have a restaurant apply for LEED NC retail, We have the carpool parkings for both customers abd staffs.
Is Greenguard Gold certification acceptable for carpet cushions?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Arthika Saseendranath on
Is Greenguard Gold certification acceptable for carpet cushions? Or is it mandatory that it has to CRI-GLP certified?
Manufacturer Declaration Letter
NC-2009 MRc4:Recycled Contentposted by Rezkar Abdulmajeed on
We completed the design of our project in 2013 and start construction in 2014.
Appeal after second review
posted by Johnathan Woodside on
I guess my question is; does the second review include review of changes made as a result of comments made during the second review?
Small Lab in Office w/ Multiple Controls
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Haley Duncan on
Hi, My project is a winery with a 300 square foot lab. There are three workstations, but only two employees work there most of the time.
10 existing villas project
posted by Adamantia Zisopoulou on
My project is an existing sea resort complex which consists of 10 villas with kitchens. Which LEED rating system can I use?
Centrifugal closed-circuit cooling tower minimun distances
NC-2009 IEQp1:Minimum IAQ Performanceposted by CT G on
Dear all, Do centrifugal closed-circuit cooling towers have to comply with table 5-1, of ASHRAE 62.1-2007? In our project, the closest distance from the cooling tower to the DOAS is 6 meters (hor
Tower’s Parking Located in a Non-LEED Podium’s Basement Parking
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Dei Dela cruz on
We have a Tower pursuing LEED NC certification being built on top of an existing Podium with basement parking. The Tower officially starts on top of the Podium.