Forum quick links
Option 2 Percentile Rainfall Event
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Jason Cocek on
I am trying to document a project under option 2 for this credit for a zero lot line project. Does anyone know what objective data compliance for this option is based on?
lighting requirements
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
And one more thing just to be sure: Does the project need to comply with lighting power allowance requirements of sections 9.5 or 9.6 (ASHRAE 90.1-2007)?
LEED Green Associate
NC-2009 IDc2:LEED Accredited Professionalposted by Dennis Comis on
Does the Green Associate level qualify for the 1 Point Idc2 ?
CS vs NC
posted by Karl Heitman on
The project is a new, ground-up, manufacturing/warehouse/office building, and due to heavy process loads, it does not seem to meet LEED NC EA p2, and the owner will not purchase any new equipment t
Does high VOC primer have any adverse effect on air quality?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Karl Heitman on
Ideally you would want everyone to use low VOC whether the product is applied on site or off site.
Aren't Corrections only supposed to be published in Apr and Oct?
posted by RETIRED on
Tristan - Your comment above "and I've been told to expect none in the second quarter either)" seems unusual because my understanding from Theresa Backhus was that Addenda (now Corrections) were on
Landscaping in phases
NC-2009 WEc1:Water Efficient Landscapingposted by Alexia Anastassiadis on
Hello everyone, I'm working on a project that contains a very large green area. The project will not have irrigation of any kind, since the project is situated in a temperate-humid region.
weighted sound reduction index VS STC
Pilot-Credits EQpc24:Acousticsposted by Ian McCall on
Hi, This credit require to evaluate the sound isolation performance of constructions using STC rating which is very common in US. Our project is in Europe where STC rating is not use.
Light Power Density Calculated Method
Retail-CI-v2009 EAp2:Minimum energy performanceposted by John Kitsalis on
I understand that their are two methods to calculating the LPD. In the process of selecting which method to choose, are there any requirements that the project must meet?
Water Usage vs FTE Classification
Schools-2009 WEc3:Water Use Reductionposted by Sadie Martin on
Hi, We are working on sizing a rainwater tank for a new building on an urban high school campus.