Forum quick links
How to earn AP with specialty?
Healthcare-v4 INc2:LEED Accredited Professionalposted by Joyce Kelly on
How does one earn LEED AP with specialty? I would like to earn the right to be LEED AP on Healthcare projects in the future. Is there a specialty exam to take? I am just BD+C.
EAP2 required HAP input summary
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Wright on
For the EAP2 upload EAP2-14 LEED is asking for the modeling software "input summary." What specific input summaries are required for Carrier HAP? I am modeling a building over 100,000 sq ft.
IEQ Credit 5 - Supply Air Recirculation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Raj G on
In our project, we have a janitor room adjacent to a toilet and these both rooms have exhaust duct which are combined together & exhausted directly to outside without re circulation. But, we h
Complex Occupancy Upload PIf3-1
NC-2009 PIf3:Occupant and Usage Dataposted by Jeannie Rueter on
The requirement for this upload is to provide project FTE calculations including daily and annual patterns.
Split review to Combined Design and Construction Review
posted by Anaïs P on
Hello, I already registered a project for split review but we haven't yet submitted the Preliminary Design Review.
Question about terrace without roof
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Haoyang Li on
Hi all, I am working on a commercial interior university restaurant project. There is a non-roof terrace at 3rd floor.
baseboard
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Anastasia Makarenko on
Does anyone know how to treat skirting board applying to requirements of this credit? Does it need to be floorscore/ CA section 01350?
What is a wetland or naturally designed pond per credit language
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Landry Watson on
Credit language clearly indicates that wetlands and naturally designed ponds can count as long as their sides are vegetated and their gradient no more than 1:4.
PC14 closed?
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
As stated by Melissa Merryweather below the link to the survey is broken.
Storm water quality within LEED Boundary
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Muhammad Faisal Azizullah Jaffar on
Hello I am currently working on a Golf course community within the middle east and in regards to the various strategies employed on site , there are vagetated filter strips, oil spearators, wet p