Additional floors of existing building

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

Our project is the major renovation of an existing building. We have added 2 new floors on the top. 1.

8
Default Avatar
ME Engineers Inc.
LEEDuser Basic Member
17 thumbs up
Mon Apr 25, 2016, 8:44 pm

Performance period and construction

EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additions
posted by  Kasandra Martin  on 

Our project is in the process of building an addition. The performance period is not yet started.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Apr 25, 2016, 8:41 pm

Exemplary Performance?

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  José Solis  on 

The BD+C Reference manual states: "This credit is not eligible for exemplary performance under the Innovation in Design section." However, a response from Tristan Roberts on June 4, 2010 states th

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2016, 6:47 pm

Room Input Report

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Bill Friedl  on 

I had a comment on a LEED review in IEQc7.1 to provide a summary table which lists the heating and cooling design parameters used for each space type and the Room Input Reports for each space type.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Apr 25, 2016, 6:12 pm

DES Condenser Water System

NC-2009 EAp2:Minimum Energy Performance
posted by  Jake Torok  on 

We're working on a small project (7,500 SF) pursuing LEED NC v2009 designed with water-source VRFs served by a shared central condenser water system with cooling towers, boilers, and pumping.

4
Mon Apr 25, 2016, 4:39 pm

Implementing all improvements in one renovations phase at a time

EBOM-2009 EAc2.2:Existing Building Commissioning—Implementation
posted by  Melissa Merryweather  on 

We're starting the audits for an EBOM project that is a university building.

3
Mon Apr 25, 2016, 4:17 pm

CxA selection

EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioning
posted by  Melissa Merryweather  on 

In LEED NC there are explicit instructions as to whom is eligible to be the projects' CxA. I don't see reference to this in LEED EBOM.

3
Mon Apr 25, 2016, 4:08 pm

Natural Ventilation

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Chilufya Lombe  on 

Good day, we have a project that is naturally ventilated. ASHRAE 90.1 2007 states that the energy cost budget method cannot be used for designs with no mechanical systems.

3
Default Avatar
Sustainability Consultant
Solid Green Consulting
LEEDuser Basic Member
23 thumbs up
Mon Apr 25, 2016, 4:07 pm

REC Certificate - Renewable Energy

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear All:- Our project don't have any Renewable energy such as Solar, Windmill so we plan to Buy a REC certificate for our Entire energy use (100%) as per ID -10161 1.Is it possible to get EAc2,

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Sun Apr 24, 2016, 11:54 pm

LEED NC: MR or LEED EBOM

LEED Rating System Selection
posted by  ABDUL MUTHALIB MOHAMED  on 

We have a manufacturing facility that under going addition of 30% of total floor area and wish to apply for LEED certification. Can we use the LEED NC? or Should we use LEED EBOM?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Sat Apr 23, 2016, 4:51 am