Best Methods for Conducting a Drawing Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Melissa Estrada  on 

My sustainability consulting firm has been conducting the con docs (drawing) reviews for our clients for LEED compliance, but the method we have been using is not the most streamlined.

4
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Thu Aug 4, 2016, 9:31 pm

cradle to gate scope?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Erin Holdenried  on 

Does the compliance with the ISO 14025 standard automatically include cradle to gate scope? Or is the scope stated separately in the product EPD?

3
Default Avatar
Sustainable Design Director
Bell Architects
LEEDuser Premium Member
41 thumbs up
Thu Aug 4, 2016, 4:18 pm

Integrative Process (IP) Guide 2.0

NC-v4 IPc1:Integrative process
posted by  Vitor Tosetto   on 

Please, someone knows where can I buy the Integrative Process (IP) ANSI Consensus National Standard Guide© 2.0? In ANSI's webstore I found v1.0 only.

10
Thu Aug 4, 2016, 3:37 pm

Building footprint

NC-2009 PIf2:Project Summary Details
posted by  Heather Holdridge  on 

Should the footprint of the project building include covered walkways, porches, etc?

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Aug 4, 2016, 7:25 am

New to LEED-ND...submitting for certification

ND-v2009 PIf1:Development Program and Site Type
posted by  Courtney Royal  on 

Hello, My first question is, if Stage 3 is the only stage in the process that will garner an actual certification level for the development, then what are the benefits of also registering under St

7
Wed Aug 3, 2016, 2:52 pm

n/a

NC-v4 SSc4:Rainwater management
posted by  Anastasia Makarenko  on 

Dear all, we're planning to install tank for collecting 180% of stormwater from 95 percentile rainfall event.

4
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Aug 3, 2016, 1:08 pm

Project is 1 building, waste is from 3 buildings

NC-2009 MRc2:Construction Waste Management
posted by  Melissa Merryweather  on 

I have a building located in a campus. Only the office tower is undergoing LEED certification but all 3 area being built concurrently.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Aug 3, 2016, 2:42 am

Hose bibs - permanent irrigation

CS-2009 WEc1:Water Efficient Landscaping
posted by  Petra Hajná  on 

Hi LEEDers. I tried to pursue the credit via calculation because the roject will use the hose bibs on regular basis for the building lifetime, not as a temporary solution.

2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Tue Aug 2, 2016, 11:19 am

Two buildings connected by a bridge

NC-2009 MPR4:Must comply with minimum floor area requirements
posted by  Eric Bautista  on 

My apology for posting a query quite not related to this section. Can I register a project consisting of two (2) identical buildings connected by a suspended bridge and both located within the dec

3
Head of Energy & Environmental Management
EB Project Management | Green Building Consultants
LEEDuser Basic Member
14 thumbs up
Tue Aug 2, 2016, 4:27 am

*sensationalism alert*!

General forums
posted by  Kathryn West  on 

This is a very helpful and detailed article.

9
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Mon Aug 1, 2016, 8:56 pm