Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED EBOM EA1 Case 2C

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Magda Aghababyan  on 

I am working on a facility that cannot obtain an Energy Star score due to building type. I wish to use the Case 2 Option 2C using a set of comparable buildings.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Fri Aug 19, 2016, 6:43 am

Discharging the rainwater to municipality facilities.

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  mohamed magdy  on 

Does discharging the collected rainwater to municipality facilities will help with achieving the requirements for credit 6.1 & 6.2? we are following Case1 - path 1, we will reclaim the rainwat

5
Fri Aug 19, 2016, 5:49 am

Denied prerequisite

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Charalampos Giannikopoulos  on 

After two rounds of review EAp2 was denied although we reckon that we had totally addressed all comments of the preliminary review and additionally the issues described as outstanding in the final

2
Default Avatar
Architect
CRA Associates, Inc.
LEEDuser Premium Member
5 thumbs up
Thu Aug 18, 2016, 5:40 pm

Assemblies

NC-2009 MRc4:Recycled Content
posted by  David Brown  on 

In idiot terms could someone please tell me what makes up an "assembly". I am a glazing contractor working on a LEED project. I have two items needing LEED submittals for the MR4 credit.

6
Assistant Site Superintendent
QBS, Inc.
LEEDuser Basic Member
3 thumbs up
Thu Aug 18, 2016, 2:16 am

KS and KD Values in Table 1 - Cannot find

NC-2009 WEc1:Water Efficient Landscaping
posted by  Amal Iqbal  on 

Hello, I checked on page 185 of the BD+C Reference as mentioned by William in a previos post, and did not see anything about species factors.

4
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Wed Aug 17, 2016, 9:40 pm

RE: LI#10397

NC-2009 EAc2:On-Site Renewable Energy
posted by  Joe Manganelli  on 

Hi All, Does anyone have any experience with LI#10397? This LI# stipulates an alternative compliance path for facilities that have 60% or more non-regulated loads. QUESTION 1: I cannot find any

3
Default Avatar
architect, human factors consultant
Fluor, Kent State University, xplr design, llc
LEEDuser Basic Member
1 thumbs up
Wed Aug 17, 2016, 8:31 pm
2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Wed Aug 17, 2016, 5:46 pm

RE: Feeding renewable energy into the project

NC-2009 EAc2:On-Site Renewable Energy
posted by  Joe Manganelli  on 

Hi All, We have a campus with a substation on-site (on owner's property) that will be owned by the local utility.

3
Default Avatar
architect, human factors consultant
Fluor, Kent State University, xplr design, llc
LEEDuser Basic Member
1 thumbs up
Wed Aug 17, 2016, 3:35 pm

EAp2

NC-2009 EAp2:Minimum Energy Performance
posted by  sherif el adly  on 

We are working on a huge project in Riyadh, to meet EAp2 we sould look for a water cooled chiller due to the area of the project and the challenge to reach a COP near to 8 to meet the 10% from base

4
ASHRAE BEMP HBDP - LEED GA, Building Performance Consultant
Zonda
LEEDuser Basic Member
14 thumbs up
Tue Aug 16, 2016, 3:55 pm

Exception G3.1.1.c and zones with minimum air changes

NC-2009 EAp2:Minimum Energy Performance
posted by  Phil Stafa  on 

Hello: I have a question related to exception G3.1.1.c which states that a separate single System 3 should be used for zones with pressurization relationships or minimum circulation rates.

3
Default Avatar
Sustainability Coordinator
Korda/Nemeth Engineering, Inc.
LEEDuser Basic Member
1 thumbs up
Tue Aug 16, 2016, 3:47 pm