Pilot-Credits PC14:Walkable Streetsposted by R Jones on
I have recently applied this criteria to a Major Refurbishment project in an Urban setting. Has anyone looked at using this pilot credit for a Commercial interiors project?
GBES Resources for WELL AP Exam
posted by Brian Salazar on
Hi all - For what it's worth, GBES now has a slide deck and flash cards available for $34.95 from their web site to use as a study guide for the WELL AP exam.
Compliance Documents for EAp2 and EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi all, I am working on my first LEED modelling work with IES and wondering what documents are needed for the submission for EAp2 and EAc1.
Mixed Use Residential plus hotel V4 Version?
posted by Beth Mosall on
Project is on an urban site, 1.5 acres, brownfield, will be fully built out with a 2 level parking deck with retail on two sides, on top of which 3 buildings and a terrace garden will be built.
Equipment relocation
CI-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
For a project relocation which may relocate existing equipment accordingly could this equipment be excluded from calculations as this has been purchased previously?
Tracking mixed recyclables off-site
CS-2009 MRc2:Construction Waste Managementposted by Maria Luisa Verticchio on
The job site we are able to begin is inner-city with many restrictions, especially square footage of actual site. There is not enough space to set up multiple bins.
Covered Roof Terrace and Green Roof
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ilana Judah on
Two questions: 1.
Planned bus stop
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by David Lazaro on
Hello, We are working on a project in an undeveloped industrial area. It is a group of three very large logistic buildings, with warehouses and offices.
LEED 2009 DES Projects - Rule Change - August 2016
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Edwards on
I'm working on a project on a collegiate campus that utilizes district chilled water and steam, and I have run into what appears to be a rule change that was snuck into the v2009 Minimum Energy Per
Material and Resource Calculator
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Angela Feulner on
Can someone please explain the difference between 'Total sustainable materials cost' and 'Total materials cost' on the Material and Resource Calculator?