Powered Equiptment Compliance

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Nelina Loiselle  on 

It is unclear to me what exactly qualifies a piece of equipment as a environmentally preferable. Does it have to meet all the BMPs listed in the chart above?

3
Mon Feb 13, 2017, 7:42 pm

Baseline 4 Orientations or Not

NC-2009 EAp2:Minimum Energy Performance
posted by  Alice chen  on 

Hi All, I am working on a LEED NC 2009 Project. I just wonder if I need to use the average results for 4 orientations for baseline model. Is it acceptable to only run 0 degree baseline model?

2
Mon Feb 13, 2017, 5:25 pm

CAV and BAS monitor

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Takayuki Hirota  on 

For CAV, a current transducer on the supply fan, an airflow switch, or similar monitoring device must be installed. If a BAS can monitor airflow fan modes (strong/weak etc.), is that sufficient to

2
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Mon Feb 13, 2017, 3:51 pm

ASHRAE 90.1-2007, 6.5.3.1.1,exception b

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, According to ASHRAE 90.1-2007, 6.5.3.1.1,exception b, individual exhaust fans with motor nameplate kW of 0.75 kW or less could be excluded when estimating Fan system power limitation. Th

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Feb 13, 2017, 6:02 am

Where is form Plf3-1?

NC-2009 PIf3:Occupant and Usage Data
posted by  Ileana Schinder  on 

I'm looking for the form required to comply with "Complex Occupancy" under form PLF3. I have a Rec Center with low full staff occupancy (5) but VERY HIGHT Peak transient occupants (642).

3
Default Avatar
Green Building Analyst
Ausonio Incorporated
LEEDuser Basic Member
3 thumbs up
Fri Feb 10, 2017, 6:09 pm

Commingled Reporting / Recording Method

NC-2009 MRc2:Construction Waste Management
posted by  Lewis Hewton  on 

Hello, I understand that a whole of facility commingled recycling rate is acceptable only when the method of recording and reporting is regulated by a local or state government authority. The met

2
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Feb 9, 2017, 10:33 pm

Pilot ACP versus credit

Pilot-Credits MRpc102:Legal Wood
posted by  Jens Apel  on 

Just to make dead sure my understanding is correct: The first line in the box under requirements here http://www.usgbc.org/node/10146311?view=language does mean, that a BD+C NC (v2009) project can

3
Wed Feb 8, 2017, 10:47 pm

HUD DDA Designation

NC-v4 LTc3:High priority site
posted by  Nathan Gauthier  on 

Can any project get this credit if they're in a DDA area? It seems like the DDA only exists to identify areas where additional subsidy is needed for low-income housing.

2
Sustainable Practice Leader
Tsoi/Kobus & Associates
LEEDuser Basic Member
12 thumbs up
Wed Feb 8, 2017, 2:49 pm

Drop-off area

Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Charlie Popeck  on 

Can the drop off area be a designated parking space?

5
Default Avatar
Architect
Perkins+Will
LEEDuser Premium Member
0 thumbs up
Tue Feb 7, 2017, 5:31 pm

ACP and Regional Priority

NC-2009 RPc1:Regional Priority
posted by  Joanna Jenkins  on 

I suspect I know the answer to this, but I'm wondering if others have any experience with earning Regional Priority points having used an Alternate Compliance Path.

3
Associate
Mahlum Architects
LEEDuser Basic Member
0 thumbs up
Tue Feb 7, 2017, 5:24 pm