Forum quick links
Taxi service to function as private shuttles
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Dustin Schoen on
Our project is located in an urban environment, we are just a few yards short of fulfilling the requirements. Our project is expected to have as little as 5 FTEs, potentially even less.
v4 Demand Response - typical peak load reduction "systems".
NC-v4 EAc4:Demand responseposted by Paul Baker on
Electric Utilities commonly have demand and consumption costs.
Prescriptive Method for IEQ 8.1
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Kristian Kicinski on
I am confused by what seems to be contradictory information in the Reference Guide and what my LEED reviewer commented. The comment says, "It is not clear whether the claimed daylight zones would
SSc5.1 - Please explain "whichever is greater"
Schools-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Amoy McGhee on
I am trying to get some clarification on this credit. Total site of a school in Washington DC is 45,186 SF and 50% of the site excluding the bldg. footprint is 13,705 SF.
Major Renovation or Core and Shell (LEED BDC_v4)?
posted by Alex Parella on
We intend to certify an existing office building, which is going to be retrofitted with the following criteria: -No intervention in the envelope -Replacement of the HVAC (both production and distr
ENERGY STAR Portfolio Manager
NC-2009 EAc5:Measurement and Verificationposted by Lou Niles II on
When does the project have to register for the Energy Star Portfolio Manager? it is not clear if a registration number needs to be shown to comply for the Credit.
Local Code Requirement
CS-2009 EAp2:Minimum Energy Performanceposted by Yong Lee Low on
LEED indicates that "Projects outside the U.S.
Manufacturers' claims and laboratory requirements.
NC-v4 EQc2:Low emitting materialsposted by Ashley Hu on
Hi there, the credit requires: Both first-party and third-party statements of product compliance must follow the guidelines in CDPH SM V1.1 -2010, Section 8.
detailed framing plans and cut list examples
Homes-v4 MRc4:Material-efficient framingposted by Phil Vanderloo on
Hi, I need to produce detailed framing plans and cut lists as required for this credit. My time is very limited so I don't want to overkill on the requirement.
TVOC certificate for a glass fiber tank
NC-v4 EQc2:Low emitting materialsposted by Lourdes Salinas on
For a project that has a glass fiber water tank inside the weather barrier in a utility space (not a working space), do we need to get a TVOC certificate for that tank?