Railway station

ND-v2009 NPDc7:Transit facilities
posted by  Noriko Nagazumi  on 

Hi, Our project includes railway station within the LEED ND v2009 project boundary, but no bus stop.

1
Fri Aug 18, 2017, 3:30 pm

Mixed Mode Ventilation for Apartment Kitchens

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Neil Sen  on 

We are designing apartments with mixed mode ventilation--the areas within 25 feet of a window will be naturally ventilated and the rest of the dwelling units will be mechanically ventilated.

1
Sun Aug 27, 2017, 10:56 pm

Existing Chillers in Basement (not in project boundary)

CI-v4 EAp3:Fundamental refrigerant management
posted by  Heather Zeto  on 

Our project is a 4-floor fit-out of a hospital tower (Less than 200,000 SF of an existing 8 Million SF building).

1
Mon Aug 28, 2017, 10:14 pm

LEED HC (major renovation) or CI (v4)?

LEED Rating System Selection
posted by  Heather Zeto  on 

I have a project that is undergoing discussion regarding which rating system to use. For all practical purposes, it is an interior fit-out of 4 floors of a hospital tower for a new unit.

1
Sat Aug 26, 2017, 7:32 pm

Exemplary performance documentation

NC-2009 MRc2:Construction Waste Management
posted by  Kavita K  on 

Working on a project which is using NC 2009 version. We have to submit for construction preliminary review, We have achieved 97% const.

1
Fri Aug 18, 2017, 7:55 pm

District calculation

Retail-CI-v4 EAc5:Enhanced refrigerant management
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, After reading "further explanation" section of the Reference Guide (page 201) we are wondering how calculations should be made for a district plant where the commercial interior is served b

1
Tue Aug 29, 2017, 3:39 pm

LEED management for multi-prime contractor project

NC-2009 MRc4:Recycled Content
posted by  Chris Gutsche  on 

We have a LEED 2009 institutional project with 12 prime contractors. There is a construction management entity with oversight of the 12 primes.

1
Fri Aug 25, 2017, 6:21 pm

Base building HVAC Efficiency and Baseline & Proposed WWR

CI-v4 EAp2:Minimum energy performance
posted by  ESD Engineer  on 

Hi, The projects space is served by the base building AHU and Chiller plants. Efficiency of which don't meet the min prescribed efficiency as per ASHRAE 90.1-2010.

1
Wed Aug 23, 2017, 1:58 pm

Baseline Ratios

CI-v4 LTc5:Reduced parking footprint
posted by  Kena David   on 

I am having a similar problem like many who have posted here with no reply. Could you please provide guidance as to how to interpret the Institute of Transportation Engineers tables?

0