Forum quick links
Pilot - option 1 - EPD
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Lise Dannesboe on
Hi.
Baseline, section 6.4.3.9 and G3.1.1, single zone system
NC-2009 EAp2:Minimum Energy Performanceposted by Sarah Leenknegt on
Dear all, I have an office building with an auditorium, which is served by the same AHU that serves the surrounding office.
Envelope Categorization
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Russell Philstrom on
Hello All-- I have two associated questions: Part 1: I'm working on a project in which a previously open arcade is being enclosed and am wondering about how to calculate envelope area.
Building Envelope Seasonal Testing & General Comment
CS-v4 EAc1:Enhanced commissioningposted by Brian Salazar on
Hi! In general, the guidelines for this credit are...very general and vague.
Window coating and films
NC-v4 EQc2:Low emitting materialsposted by Edgar Arevalo on
Would window coating and films fall under Interior Paints and Coatings section for this credit, or do they not apply?
compliance for naturally ventilated spaces
NC-v4 EQp1:Minimum indoor air quality performanceposted by Poorva Keskar on
Referring to the FAQs fan-assisted ventilation in naturally ventilated spaces can be considered as mechanical ventilation.
LEED certification fees
posted by Nazli Hussain on
Can you please tell me about all compulsory certification fees to get LEED certification? Registration fees, split / combined design review fees , appeal fees - all are compulsory . Am i right ?
Underground infiltration tank
NC-v4 SSc4:Rainwater managementposted by Frantisek Macholda on
Hello, our project is constrution of the new storage hall on the place of the previously existing old one. (Demolition + new construction).
Qualify for Option 3 Brownfield Remediation???
NC-v4 LTc3:High priority siteposted by on
The project conducted a Phase I ESA and concluded that there maybe potential for chemical vapor intrusion to indoor air from off-gassing associated with the groundwater plume, therefore a phase II
Evaporative water use
NC-v4 WEp2:Indoor water use reductionposted by MKK LEED on
The new prerequisite states "No once-through cooling with potable water for any equipment or appliances that reject heat". Does this exclude IDDE systems?