Forum quick links
what type of document required uploading to LEED ARC
posted by Subrota Roy on
Hi, For existing building LEED certification which type of data/document required upload to LEED ARC & what will be the timeline & process ? If any example it will be very good for me.
VRF System Computation
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Katherine Mariano on
Hi All, I just want to ask if the pre-charge or additional charge of the VRF system is included on the computation for Rc (Refrigerant Charge). Thanks!
EPDM tile and Wood Porch
Schools-NC-v4 EQc2:Low emitting materialsposted by Emmanuel Pauwels on
We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a
Treatment of Outdoor Air for Incomplete Spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Joseph Chappell on
I recently received LEED review comments regarding the treatment of incomplete space in an energy model for a proposed new construction building.
Outdoor air delivery monitoring system for evaporative cooler
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Gopinath Vasu on
For projects served by evaporative cooler which is supplying 100% fresh air to conditioned spaces, is it still require to have an outdoor air delivery monitoring system. Even though at minimum flo
Atrium with reception desk
CS-v4 EQc4:Daylightposted by Martin K on
Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle.
Over limit adhesive used while building is open
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jayme Antolik on
I am on a project where the contractor used an adhesive that exceeds the VOC limit for that type but the building was open when they used it.
Process water and residential units
NC-v4 WEp2:Indoor water use reductionposted by MAUDE PINTAL on
Our project includes a community center and a multi-residential part.
Active freight rail
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Yong Lee Low on
Hi, in my country, we do not have freight rail (or railway to transport cargo from my understanding). We only transport cargo by ship or by plane.
Different CxA for Construction other than one hired duringDesign
CS-v4 EAc1:Enhanced commissioningposted by mohammad Hassan on
Can a different CxA for a project Construction Phase be hired other than the one hired during Design Phase ?