Gym is throwing off IEQ credits!
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ileana Schinder on
We are working on a Recreation Center (Total SF 19,200), the gym is 7,200 and the rest of the building is made up of classrooms and other shared spaces.
Daylighting Simulations
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Joel Jude Tadeo on
For a project that has multiple typical floors and a large area, is it allowable to simulate a typical floor and just multiply the non/daylit areas for documentation?
Help with LEED ND
ND-v4 MPR1:Must be in a permanent location on existing landposted by T J on
Im a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including check
Exterior windows and doors?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Erin Holdenried on
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?
How to use combination of Option 1 and Option 2?
NC-2009 MRc5:Regional Materialsposted by Erica Downs on
In the FAQ section above, it says "The two options are available to be used on the basis of an individual product or material, so you can mix and match as needed." Does anyone know how to do this?
LEED O&M for building additions
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Steve Gross on
I am in the process of documenting LEED O&M credits for a museum that is building an addition.
Compliance path for demonstrating minimum daily transit trip
CI-v4 LTc3:Access to quality transitposted by Dipti Talwar on
I am working on a project located in India.
smoke leakage test for duct
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test, prior to final air leakage test since the project specs is giving a small allowable 1% from basis of des
Option 2 - Leadership Extraction Practices - PEFC wood?
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sara Johansson on
Is PEFC wood under Option 2 - Leadership Extraction Practices accepted?
Flush out for 1 storey high bay warehouse
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Renaud Gay on
Hello, We have a 1 storey 30m high bay warehouse as a part of our project.