Forum quick links
FAO EToCalc software help
NC-v4 IPc1:Integrative processposted by S. Sachs on
Hello, I'm working on a project in Kuwait and need to achieve the IPc1 credit for water consumption. I've been struggling to use the LEED-recommended ETo calculator tool, produced by the FAO, whi
Compartmentalization
NC-v4 EQp2:Environmental tobacco smoke controlposted by soha yamani on
I am really confused with the language of this credit , can you please clarify the below 1- Does EACH unit have to be sealed and Compartmentalized or only Residential units allowing smoking?
v2009_Minimum Energy Performance Calculator_v06
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am working on a LEED NC 2009 project and have questions about filling up the v2009_Minimum Energy Performance Calculator_v06. Hope someone can give me some advice.
Minimum Parking Space Exception
Schools-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Anne Agan on
We have a LEED schools project in a suburban setting and the minimum zoning requirement is 114 while the district’s demand for more spaces is causing us to provide 175.
Residential on a university campus.
NC-v4 LTc4:Surrounding density and diverse usesposted by Peter Doo on
How are student residence halls classified on a college campus?
Achieving Same Pilot Credit Twice?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Patty Lloyd on
Is it acceptable to attempt the same pilot credit on more than one project? For instance, I achieved PC81 on one project. I was wondering if it is acceptable to attempt it on another project?
Pilot Credit Closed
Pilot-Credits EQpc22:Interior lighting - qualityposted by Laurel Swan on
This Pilot Credit is now listed as closed to new registrations and I do not see it in the Innovation Catalog. Does that mean that this is no longer an option for an Innovation in Design credit?
Latest LEED Online Form
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by AtSite Inc on
The most recent LEED Online form I'm looking at asks for the plan to be uploaded but then only asks you to "Summarize how each operational element was implemented in an environmentally sensitive ma
Replacing filters prior to occupancy
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ashley Love on
We have our preliminary review comments back and had a comment on this credit about the timeline of replacing the filters.
Replacing filters prior to occupancy
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ashley Love on
**I did post this under the IEQc3.1 credit in Schools, too. My project is a school, but I wanted to make sure this question was seen, as my question is not "school only".