Can't find pipe insulation that meets LEED V4 criteria
posted by Phil Vanderloo on
Can someone guide me in to some pipe insulation for 1/2" pex piping that meets the requirements of LEED V4 Homes. Needs to be 1/2" wall thickness, minimum R-4 Everything I can get locally is R3.5,
R-4 pipe insulation
Homes-v2008 EAc7:Water heatingposted by Phil Vanderloo on
Does anyone have a recommendation for pipe insulation that meets LEED V4 criteria? Min R-4, 1/2" wall thickness Thank You
Option 1 or Option 2
CS-2009 EAc6:Green Powerposted by Martin Meehan on
Hello all, I am working on a Core and Shell project that is targeting Green Power. While we have an energy model for the project, can you confirm if the project MUST use the Option 1?
LEED CI MPR for existing land...
CI-v4 MPR1:Must be in a permanent location on existing landposted by Keith Robertson on
V4 cites the MPR requirement to build on already existing land as a requirement for CI projects. Isn't that a given?
Exterior connected lighting power - Enclosed mall
Retail-CI-v2009 EAc1.1:Optimize energy performance - lighting powerposted by LEED Pro Consultant on
We have a retail project located in an enclosed mall. The retail store has some illuminated logos on the entrance and the display window.
Salvaged Materials Code Conflict
NC-2009 MRc3:Materials Reuseposted by Annalise Reichert on
I am working on a 17-story multi-family new construction project in California that will not involve any demo of existing structures at the site.
Requirements for instant water heater with no storage tank
NC-2009 EAp2:Minimum Energy Performanceposted by Gustavo De las Heras Izquierdo on
Hallo, I have read the insulation requirements in Section 7.4.3 but it seems to focus on circulating and non-circulating systems with a storage tank.
Garage exhaust fan criteria
Homes-v4 EQc6:Enhanced garage pollutant protectionposted by Phil Vanderloo on
I have a living area over a garage and, per LEED protocol, I need an exhaust fan in the garage that will allow 3 air changes per hour. Calculations call for min 345 cfm in my case.
Blowout toilets in v4
NC-v4 WEp2:Indoor water use reductionposted by Ben Roush on
In v2009, you could use 3.6 GPF blowout toilets in institutional uses, but could not show savings for using blowout toilets with lower flow.
No New Parking Inquiry
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Helene Lefkowitz on
A campus project we are working on is including (1) space designated specifically for a utility vehicle and (1) space for handicap accessibility.