Requirements

Do not develop buildings, hardscape, roads or parking areas on portions of sites that meet any of the following criteria:

  • Prime farmland as defined by the U.S. Department of Agriculture in the United States Code of Federal Regulations, Title 7, Volume 6, Parts 400 to 699, Section 657.5 (citation 7CFR657.5). Projects outside the U.S. may use a local equivalent.
  • Previously undeveloped land whose elevation is lower than 5 feet (1.5 meters) above the elevation of the 100-year flood as defined by the Federal Emergency Management Agency (FEMA), an equivalent local regulatory agency, or a professional hydrologist. [Europe ACP: Flood Plains]
  • Land specifically identified as habitat for any species on federal or state threatened or endangered lists.Projects outside the U.S. may use a local equivalent. [Europe ACP: Habitat]
  • Land within 100 feet (30 meters) of any wetlands as defined by the U.S. Code of Federal Regulations 40 CFR, Parts 230-233 and Part 22, or a local equivalent definition outside the U.S., and isolated wetlands or areas of special concern identified by state or local rule, OR within setback distances from wetlands prescribed in state or local regulations, as defined by local or state rule or law, whichever is more stringent.
  • Previously undeveloped land that is within 50 feet (15 meters) of a water body, defined as seas, lakes, rivers, streams and tributaries that support or could support aquatic life, recreation or industrial use, consistent with the terminology of the Clean Water Act.
  • Land that prior to acquisition for the project was public parkland, unless land of equal or greater value as parkland is accepted in trade by the public landowner (park authority projects and projects which are operated by and support the function of the park are exempt).
  • Alternative Compliance Paths (ACPs)

    Europe ACP: Flood Plains
    Projects in Europe may use the Directive 2007/60/EC definition of floods with a medium probability (likely return period ≥ 100 years).
    Europe ACP: Threatened and Endangered Species
    Projects in Europe may use the Natura 2000 network of protected areas and the European Red List.[view:embed_resource=page_1=4887966][view:embed_resource=page_1=10039154]
    SITES-LEED Equivalency
    This LEED credit (or a component of this credit) has been established as equivalent to a SITES v2 credit or component. For more information on using the equivalency as a substitution in your LEED or SITES project, see this article and guidance document.
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Addenda

10/1/2012Updated: 2/14/2015
Global ACP
Description of change:
Add the following to the end of the second bullet: ", an equivalent local regulatory agency, or a professional hydrologist."
Campus Applicable
No
Internationally Applicable:
Yes
10/1/2012Updated: 2/14/2015
Global ACP
Description of change:
The parenthetical in the sixth bullet should read: "(park authority projects and projects which are operated by and support the function of the park are exempt)."
Campus Applicable
No
Internationally Applicable:
Yes
10/1/2012Updated: 2/14/2015
Global ACP
Description of change:
Replace "fish" with "aquatic life" in the fifth bullet.
Campus Applicable
No
Internationally Applicable:
Yes
10/1/2012Updated: 2/14/2015
Global ACP
Description of change:
Add the following sentence to the end of the third bullet: "Projects outside the U.S. may use a local equivalent."
Campus Applicable
No
Internationally Applicable:
Yes
10/1/2012Updated: 2/14/2015
Global ACP
Description of change:
Add the following sentence to the end of the first bullet: "Projects outside the U.S. may use a local equivalent."
Campus Applicable
No
Internationally Applicable:
Yes
11/1/2011Updated: 2/14/2015
Reference Guide Correction
Description of change:
Replace the definition of "Previously developed sites" with "Previously developed sites are those altered by paving, construction, and/or land use that would typically have required regulatory permitting to have been initiated (alterations may exist now or in the past). Previously developed land includes a platted lot on which a building was constructed if the lot is no more than 1 acre; previous development on lots larger than 1 acre is defined as the development footprint and land alterations associated with the footprint. Land that is not previously developed and altered landscapes resulting from current or historical clearing or filling, agricultural or forestry use, or preserved natural area use are considered undeveloped land. The date of previous development permit issuance constitutes the date of previous development, but permit issuance in itself does not constitute previous development."
Campus Applicable
No
Internationally Applicable:
No
10/1/2012Updated: 2/14/2015
Global ACP
Description of change:
Add the following after "Part 22" in the first sentence of the fourth bullet: "or a local equivalent definition outside the U.S.,"
Campus Applicable
No
Internationally Applicable:
Yes
10/1/2012
LEED Interpretation
Inquiry:

Can sidewalks, roads, and other hardscape areas located above a project building\'s underground parking structure, which are required by the governing municipality to be constructed of non-compliant materials, be excluded from the SSc7.2 and SSc7.1 calculations?

Ruling:

Similar to LEED Interpretations #2293 and #3101, sidewalks, roads, and areas that cover un-conditioned spaces (such as parking garages) are considered hardscape or landscape nonroof surfaces. Thus, they should be included in the calculations for SSc7.1 Heat Island Effect- Nonroof. In situations where infrastructure, materials, or surfaces are owned, operated and maintained by the local governing body, project teams may exclude the area of the material from the calculations for SSc7.2 and SSc7.1. This exemption can be applied only if projects do not have any control over the materials used for the surfaces in question. If the materials are owned and operated by the project, but the local jurisdiction specifies that they must meet certain criteria, the materials may not be excluded from the calculations. Applicable Internationally.

Campus Applicable
No
Internationally Applicable:
Yes
10/1/2012
LEED Interpretation
Inquiry:

Can helipads and other functional space areas be exempted from SSc7.2 Heat Island Effect- Roof calculations?

Ruling:

Roof area that consists of functional, usable spaces- such as helipads, recreation courts, and areas covered by equipment, solar panels, and appurtenances- can be exempted from the roof calculations for SSc7.2. Projects are not eligible for SSc7.2 if the exempted spaces encompass the entire roof area. Applicable Internationally.

Campus Applicable
No
Internationally Applicable:
Yes
8/1/2011
LEED Interpretation
Inquiry:

Many of the ASTM Standards we reference have been withdrawn, upgraded, or superseded. Provide guidance on which updated standards should be used.

Ruling:

The withdrawn ASTM Standards listed- ASTM E1980-01 and ASTM E903-96- are still the correct references for SSc1: Site Selection, SSc7.1: Heat Island Effect, Non-Roof, and SSc7.2: Heat Island Effect-Roof. These two standards were not withdrawn for technical reasons, but were withdrawn because they had not been updated within 8 years. Testing can still be performed for these as well as the superseded standards. The updated versions of the superseded standards can be used, but are not required:Old: ASTM E408-71(1996), Current: E408-71(2008)Old: ASTM C1371-04a, Current: C1371-04a(2010)Old: ASTM E1918-97, Current: E1918-06 Old: ASTM C1549-04, Current: 1549-09Note: This Interpretations is also applicable to Sustainable Sites Credit 7.1: Heat Island Effect- Non-Roof and Sustainable Sites Credit 1: Site Selection, see LEED Interpretations dated 8/1/2011 ID number 10092 and 10094 respectively. Applicable Internationally.

Campus Applicable
No
Internationally Applicable:
Yes
8/1/2011
LEED Interpretation
Inquiry:

Many of the ASTM Standards we reference have been withdrawn, upgraded, or superseded. Provide guidance on which updated standards should be used.

Ruling:

The withdrawn ASTM Standards listed- ASTM E1980-01 and ASTM E903-96- are still the correct references for SSc1: Site Selection, SSc7.1: Heat Island Effect, Non-Roof, and SSc7.2: Heat Island Effect-Roof. These two standards were not withdrawn for technical reasons, but were withdrawn because they had not been updated within 8 years. Testing can still be performed for these as well as the superseded standards. The updated versions of the superseded standards can be used, but are not required:Old: ASTM E408-71(1996), Current: E408-71(2008)Old: ASTM C1371-04a, Current: C1371-04a(2010)Old: ASTM E1918-97, Current: E1918-06 Old: ASTM C1549-04, Current: 1549-09Note: This Interpretations is also applicable to Sustainable Sites Credit 7.1: Heat Island Effect- Non-Roof and Sustainable Sites Credit 7.2: Roof, see LEED Interpretations dated 8/1/2011 ID number 10093 and 10092 respectively. Applicable Internationally.

Campus Applicable
No
Internationally Applicable:
Yes
11/1/2011
LEED Interpretation
Inquiry:

Would aggregate and chat covered areas be considered hardscape or a non-hardscape, pervious paving type surface? If the aggregate and chat are considered hardscape, what SRI values should be used, or how is the SRI value for these materials determined? If no industry standard is available, is it permissible to compare the aggregate/chat to a material with a known SRI value? Or could we use the value from a comparable color on the Munsell Color Code (or similar)?

Ruling:

Aggregate and chat areas must be considered hardscape, and would not count as open-grid pavement systems, for the purposes of this credit. To determine the SRI for materials that do not have recognized standard values (e.g. new gray concrete), the materials must be individually tested (per LEED NC v2.1 CIR Ruling dated 6/27/2003). As stated in the credit description, it is necessary to provide the documentation indicating the solar reflectance index of the aggregate/chat as meeting the requirement. It is not acceptable to compare materials used on the project to a material with a known SRI value. Color values do not have direct correlation to emissivity and solar reflectance values which are the basis for the SRI calculation. Aggregate may be tested using ASTM E1918-06 (Solar Reflectance) and ASTM E408-71(2008) (Thermal Emittance) and then the SRI may be calculated using ASTM E1980. Applicable internationally.

Campus Applicable
No
Internationally Applicable:
Yes
10/1/2012
LEED Interpretation
Inquiry:

Can sidewalks, roads, and other hardscape areas located above a project building\'s underground parking structure, which are required by the governing municipality to be constructed of non-compliant materials, be excluded from the SSc7.2 and SSc7.1 calculations?

Ruling:

Similar to LEED Interpretations #2293 and #3101, sidewalks, roads, and areas that cover un-conditioned spaces (such as parking garages) are considered hardscape or landscape nonroof surfaces. Thus, they should be included in the calculations for SSc7.1 Heat Island Effect- Nonroof. In situations where infrastructure, materials, or surfaces are owned, operated and maintained by the local governing body, project teams may exclude the area of the material from the calculations for SSc7.2 and SSc7.1. This exemption can be applied only if projects do not have any control over the materials used for the surfaces in question. If the materials are owned and operated by the project, but the local jurisdiction specifies that they must meet certain criteria, the materials may not be excluded from the calculations. Applicable Internationally.

Campus Applicable
No
Internationally Applicable:
Yes
7/1/2014
LEED Interpretation
Inquiry:

The project team is planning on installing a Cogeneration System that will take Biogas and turn it into Electricity to be used wholly on-site. The heat produced by this Cogeneration system will also fully be used on-site to preheat heating hot water and domestic hot water via a heat exchanger and potentially to power an absorption chiller.The building will receive the Biogas from a local Biogas provider and plans to enter into at least a 10 year contract with this provider to supply enough Biogas to the building to fully power the planned Cogeneration system. The contract will stipulate both that enough Biogas will be fed into the pipeline to meet required demands of the Cogeneration system and that the Biogas will be metered to prove that the actual amount of Biogas supplied meets the contracted requirements at all times.Though the Biogas is not being piped exclusively to the site (contractually it is supplied exclusively via project ownership funds), it is transported directly to the site in the existing natural gas pipeline. This approach achieves the exact same net result on the Natural Gas grid as piping Biogas exclusively to the project site in its own dedicated pipeline and allows the project to avoid having to dig up 100s of miles of land and lay a brand new pipeline to the project, something that would have a significantly detrimental effect on the local environment. In an urban environment like where the project is located, there is little or no option to be able to refine and extract Biogas on-site or even very close to a site, so the approach the project team is suggesting is the best and most reasonable alternative.Is this approach acceptable in accordance with the Reference Guide and Addendum 100001081 (November 1, 2011)?

Ruling:

Directed Biogas purchase is not considered on-site renewable energy based on the current EAc2 credit requirements, addenda and LEED Interpretations, because the gas consumed on-site is not the same as the biogas that the project purchased. Please note that the referenced Addendum 100001081 does not allow for the fuel used on site to be different than the fuel that was purchased for the project. The referenced addendum applies for situations such as landfill gas piped directly to the project from a nearby landfill, or wood pellets from wood mill residue that are trucked to the project. In either case, it would not be acceptable for the landfill gas or pellets generated from wood mill residue to be "purchased" by the project, used in another project, and replaced in the project with natural gas or wood pellets produced from tree tops. Also, note that NREL refers to directed biogas as off-site renewable energy.

Campus Applicable
Yes
Internationally Applicable:
Yes
8/1/2011
LEED Interpretation
Inquiry:

Many of the ASTM Standards we reference have been withdrawn, upgraded, or superseded. Provide guidance on which updated standards should be used.

Ruling:

The withdrawn ASTM Standards listed- ASTM E1980-01 and ASTM E903-96- are still the correct references for SSc1: Site Selection, SSc7.1: Heat Island Effect, Non-Roof, and SSc7.2: Heat Island Effect-Roof. These two standards were not withdrawn for technical reasons, but were withdrawn because they had not been updated within 8 years. Testing can still be performed for these as well as the superseded standards. The updated versions of the superseded standards can be used, but are not required:Old: ASTM E408-71(1996), Current: E408-71(2008)Old: ASTM C1371-04a, Current: C1371-04a(2010)Old: ASTM E1918-97, Current: E1918-06 Old: ASTM C1549-04, Current: 1549-09Note: This Interpretations is also applicable to Sustainable Sites Credit 7.2: Heat Island Effect-Roof and Sustainable Sites Credit 1: Site Selection, see LEED Interpretations dated 8/1/2011 ID number 10093 and 10094 respectively. Applicable Internationally.

Campus Applicable
No
Internationally Applicable:
Yes
11/1/2011
LEED Interpretation
Inquiry:

There is a stainless steel tube veil that covers the complete building. The tubes are placed with a 1 mm spacing between each other, and the material interior cannot be seen. Therefore, we would like to conduct a test to verify if the SRI of the tubes will comply with the LEED requirements (equal or greater than 78). Due to the originality of the exterior facade, we would like to know what type of test should be conducted:
Option 1 - Test using a 4mx4m mock up of the roof assembly and test the reflectance per ASTM 1918,
Option 2 - A flat sample test of all the materials installed on the roof
Please advise if there are any other tests that would need to be conducted.

Ruling:

The Referenced LEED Standard of ASTM 1918-97 has been superseded by ASTM 1918-06. For a roof with a veil design, or similar non-homogenous materials, the project should perform a SRI test to ASTM E1175 - 87(2009) Standard Test Method for Determining Solar or Photopic Reflectance, Transmittance, and Absorptance of Materials Using a Large Diameter Integrating Sphere. When submitting for LEED Certification, please include a copy of this interpretation and a summary of any testing results that document the SRI rating for the installed veil surface.Projects may wish to test any mock-up to assess credit compliance before testing installed materials, but the testing for certification should be done for the installed roofing assembly. Applicable internationally.

Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Do not develop buildings, hardscape, roads or parking areas on portions of sites that meet any of the following criteria:

  • Prime farmland as defined by the U.S. Department of Agriculture in the United States Code of Federal Regulations, Title 7, Volume 6, Parts 400 to 699, Section 657.5 (citation 7CFR657.5). Projects outside the U.S. may use a local equivalent.
  • Previously undeveloped land whose elevation is lower than 5 feet (1.5 meters) above the elevation of the 100-year flood as defined by the Federal Emergency Management Agency (FEMA), an equivalent local regulatory agency, or a professional hydrologist. [Europe ACP: Flood Plains]
  • Land specifically identified as habitat for any species on federal or state threatened or endangered lists.Projects outside the U.S. may use a local equivalent. [Europe ACP: Habitat]
  • Land within 100 feet (30 meters) of any wetlands as defined by the U.S. Code of Federal Regulations 40 CFR, Parts 230-233 and Part 22, or a local equivalent definition outside the U.S., and isolated wetlands or areas of special concern identified by state or local rule, OR within setback distances from wetlands prescribed in state or local regulations, as defined by local or state rule or law, whichever is more stringent.
  • Previously undeveloped land that is within 50 feet (15 meters) of a water body, defined as seas, lakes, rivers, streams and tributaries that support or could support aquatic life, recreation or industrial use, consistent with the terminology of the Clean Water Act.
  • Land that prior to acquisition for the project was public parkland, unless land of equal or greater value as parkland is accepted in trade by the public landowner (park authority projects and projects which are operated by and support the function of the park are exempt).
  • Alternative Compliance Paths (ACPs)

    Europe ACP: Flood Plains
    Projects in Europe may use the Directive 2007/60/EC definition of floods with a medium probability (likely return period ≥ 100 years).
    Europe ACP: Threatened and Endangered Species
    Projects in Europe may use the Natura 2000 network of protected areas and the European Red List.[view:embed_resource=page_1=4887966][view:embed_resource=page_1=10039154]
    SITES-LEED Equivalency
    This LEED credit (or a component of this credit) has been established as equivalent to a SITES v2 credit or component. For more information on using the equivalency as a substitution in your LEED or SITES project, see this article and guidance document.