NC-2009 SSc2:Development Density and Community Connectivityposted by Faith Wilbert on
I'm struggling finding the building information for the surrounding areas. I have checked the zoning maps, and property tax doc but can't find all the information. Any other suggestions?
CA 01350-compliant bambo flooring isn't NAUF
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Gail Vittori on
I'm working with a project that has used a bamboo flooring material that complies with Floorscore/CA 01350 and contains urea-formaldehyde.
entry systems
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by Emmanuel Pauwels on
In order to comply with this system, is it mandatory to have entryway systems installed (either matts or grid) or is it possible to comply without having these entryway systems?
One outside air intake for multiple AHUs
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Ilona Johnson, PE, CEM, LEED AP on
Has anyone had experience documenting IEQp1 in the following situation?: I recently visited a facility that has one outdoor air intake for multiple AHUS.
Pedestrian Access
NC-2009 SSc2:Development Density and Community Connectivityposted by Shannon Deeb on
Pedestrian access is defined in the reference guide as "Allows people to walk to services without being blocked by walls, freeways or other barriers." Are sidewalks and crosswalks required?
Type 1B Multi-family
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jeremy Kuhre on
Has anyone successfully pursued Option 2 Case 2 (blower door testing) for type 1B multi-family project?
Revolving doors
posted by Stephanie Graham on
I am helping our project team with a public building in Qatar under LEED-NC v2009. Main entry has a revolving door.
Data Center Energy Calculator Tool
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Jack Jenkins on
Does anybody have any experience with this new tool or know whether any further guidance on how it should be used is available? I have two questions in particular: 1) How is the baseline electrica
Addition Project Boundary remote from existing parking
Schools-NC-v4 MPR2:Must use reasonable LEED boundariesposted by Larry Turbes on
We are planning on certifying a school addition. The existing building is not certified and there will be a clear boundary between the addition and existing building.
Option 2: ASHRAE 90.1-2007 Section 11?
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Steve Gross on
Even though the credit language does not state it explicitly, I read "reduce design energy cost compared with the energy cost budget for regulated energy components" to mean "reduce the design ener