Forum quick links
Anyone in the UK has achieved this credit?
CS-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Carine Guenand on
Particularly, for a project with fire rated timber doors?
Process water calculations
Healthcare-v2009 WEp1:Water use reductionposted by Gustavo De las Heras Izquierdo on
Regarding the "cycles per day" and "daily usage multiplier" columns in table WEp1-6: 1-Is there any study or guide to be used in order to populate these cells? 2-Are there any recommended ratios o
Sample PI-Form 3-1 Complex Occupancy Upload
NC-2009 PIf3:Occupant and Usage Dataposted by Jamison Hill on
Can someone share an example of a complex occupancy upload done in a excel that was approved by LEED.
Stremlined Path vs. No Energy Star Label?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Jalal Avades on
If the building was awarded an Energy Star label in April 2013 with 80 points and now we are submitting for certification in January 2014 (less than a year from being awarded the label). If we foun
Documentation for Existing Certified Projects on Campus
posted by Caroline O'Leary on
I'm working on documenting a project on a community college campus. The Owner does not have the documentation from the previous project which was LEED certified.
site area
EBOM-2009 PIf2:Project Summary Detailsposted by Andres Giraldo on
Hi, our project is classify as Industrial-manufacturing facility.
Is the bottom of the basin allowed in Open Space Calculations?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Candice Rogers on
Hello - We have two landscaped detention basins on our site. Their slopes are vegetated, but exceed the 1:4 ratio.
Historical Buildings with Protected Facades
ND-v2009 GIBp2:Minimum building energy efficiencyposted by Jean Marais on
We are faced with the question of whether it is feasable to attempt a LEED ND certification on a German neibourhood which houses 100% historical buildings with protected facades.
EAC1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by Maria Isabel Conde on
We have a project in a leed certified building. I want to know if the UA calculation only requires use the project areas or all the building areas. And we need to submit the product cut sheets?
LEED V3 or V4 for LEED CS project
CS-2009 PIf1:Minimum Program Requirementsposted by Jin Yang on
Hi Kemberly, I'm planning to register a LEED CS project in China that needs precertification as soon as possible.