Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

PVC free wallcoverings and shower curtains

EBOM-v4 MRp2:Facility maintenance and renovations policy
posted by  joel longstreth  on 

Joining the party late. Trying to figure out if, how and where our not PVC for wallcoverings and shower curtains fits into LEED.

1
Fri Oct 18, 2013, 5:58 pm

Number of recycling rooms in one building

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Guillermo Alonzo  on 

Hello, If a building has two basements, and the project requires a 225 SF recycling room, is it possible to divide the recycling room in two ? i.e.

1
Fri Oct 25, 2013, 4:23 pm

ASHRAE STANDARDS 90.1 Appendix G - Humidity Controls

NC-2009 EAp2:Minimum Energy Performance
posted by  Curtis Clark  on 

Appendix G does not address humidity controls.

1
Fri Oct 18, 2013, 8:47 pm

Leed Online Forms

NC-2009 MRc2:Construction Waste Management
posted by  kelly saunders  on 

I'm not clear about using the LEED online forms. Are they supposed to filled in periodically and uploaded into the system or is this done at the end of the project when submitting for credits?

1
Fri Oct 18, 2013, 8:24 pm

V4 WEc2 template issues

CS-2009 WEc2:Innovative Wastewater Technologies
posted by  Lianne Lami  on 

Our other online templates are working, but WEc2 seems to not function. we have achieved 76% water use reduction, but the template won't resolve for 2 points? thoughts?

1
Mon Nov 4, 2013, 7:06 pm

What controls are required so autoshades can comply with credit?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Abena Darden  on 

We note that the prescriptive method for IEQc8.1 allows view preserving automated shades to be used as a glare control device, and that in the sidelighting section of theTable IEQ-1 spreadsheet, an

1
Mon Oct 21, 2013, 12:33 pm

Two-story office building attached to warehouse

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Silvia Ruiz  on 

Hi, I am working on a project that consists of a two-story office building attached to a warehouse, both of which belong to the same owner.

1
Tue Nov 5, 2013, 4:07 pm

Views in an operation control center

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Ahmed Hidayet  on 

Our project has an operation control center which is the largest office space in the project.

1
Mon Oct 21, 2013, 12:30 pm
1
Tue Nov 5, 2013, 1:52 pm

major change in project boundary

ND-v2009 PIf2:Project Timeline
posted by  Emmanuel Pauwels  on 

Our project is contemplating LEED ND certification. The developer wants to keep his options open towards a potential sale of part of the project to another developer.

1
Tue Oct 22, 2013, 2:17 am