Forum quick links
waterless urinals
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Emmanuel Pauwels on
We have tried to comply with this credit using waterless urinals and dual flush toilets with a very low flush (3L/435L)
Existing Parking conditions
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by John Stouffer on
The existing conditions of the site have 55 existing parking spaces. Our plans show that we are taking out 14 parking spaces and adding 16 addition spaces, totaling 71 parking spaces.
Building Automation System (BMS)
NC-2009 EAp2:Minimum Energy Performanceposted by Marco Antonio on
Hello We are developing a project of air conditioning a building certified LEED NC 2.2 and wonder if all Fancoletes and fans small (about 200), should be interlidados in the building automation sys
Adjoining Historic Buildings
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Brownsville Area Revitalization Corporation on
We are working to restore two commercial/residential historic buildings with the intent of achieving LEED certification.
Regional industrial practices
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I am facing a problem meeting the eap2 credit since my project presents almost 80% energy cost related to process.
Determining FTE, PTE
NC-2009 PIf3:Occupant and Usage Dataposted by Catherine Blakemore on
How are the FTE and PTE numbers derived? The project is for a surgical addition.
Space listings & supporting documentation
Healthcare-v2009 IEQc2:Acoustic environmentposted by Catherine Blakemore on
I am not familiar with this credit so bare with me. Does each space (room) have be be listed on the IEQc2 form? Is there spread sheet format that can be used? Any recommendations will be greatly
LEED for Multi-Family Homes Bicycle Security
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Nicole Koedyker on
For the bike storage at this location, our intent is to create closets similar that can be locked, which would certainly meet this requirement.
Full list of
posted by Michael E. Edmonds-Bauer on
I was checkin the USGBC website looking for more LEED interpretations that could give us a hand in documenting SSc4.3.
Hi all, (I posted this
posted by Diaa Madkour on
Hi all, (I posted this comment under MPR section but thought it may apply here too) My company received a request for proposal to work as LEED assessor for three office buildings under core and she