Forum quick links
EAp2 and EAc1 Reviews and Appeals
posted by Cynthia Estrada on
Below is an excerpt from a communication I recently received: " We are seeing a trend towards multiple submittals and appeals from GBCI since the adoption of version 2009.
Duration in lavatory faucets – 15 or 30 seconds?
CS-2009 WEp1:Water Use Reductionposted by Maria Porter on
On LEED Online and in the Reference Guide one use of a lavatory faucet is 15 seconds.
Commissioning Authority (CxA) Regional experience?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ameet AA on
LEED user guide states that the CxA must have Documented commissioning authority experience in at least 2 building projects. 1) 2 Building project could be from any region?
Air Extraction System
CS-2009 IEQp1:Minimum IAQ Performanceposted by Luis Miguel Diazgranados on
We are working on a natural ventilated CS office building. The entire building is going to be natural ventilated with no AC.
Where to upload responses to Preliminary Review
posted by Liz Valdez on
My project has gone through the preliminary review. We had a number of questions related to EAp2.
we have a training ceter
posted by ola shunnar on
we have a training ceter building and would like to register it under the CI, and my question is on the MPR, form 2: there is two phrases in the form that make me confused, which are the a) Project
Calculating when only a certain % of male RR's have urinals.
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rand Ekman on
While the Water Use Reduction Additional Guidance document, (updated August 16, 2010), clearly address’ how to calculate total daily uses both with and without urinals.